Information

  • Document number

  • Facade Type

  • Level

  • Elevation

  • Conducted on

  • Prepared by- Lider

CONTROL/CHECK

SFS substructure assembly check

  • Obtain and check site datums, grids and setting out points

  • Fixings in correct position

  • Studs/brackets fixed as per provided drawings

  • Correct type and number screws, bolts as per drawings

  • Screws in correct position at no more than 300mm apart?

EPDM

  • Check EPDM for tears and holes.

  • Check the EPDM surface is dry and clean before Novoproof Kleber FA/I (Flexbond Plus) application?

  • Is Kleber FA (Flexbond Plus) fully applied to the sealing surface with a spatula and at the correct width? (80~100mm)

  • Check EPDM interior/exteriors corners if sealed properly.

ROCKWOOL and Firestop

  • Is rockwool dry?

  • Rockwool installed as per provided drawings

  • After installation of rockwool: are all the gaps covered?

  • Is rockwool firestop free from damages?

Cement boards

  • CC Boards fixed

  • Screws grab into SFS structure?

  • Screws at correct centres in CC Boards

  • Are all gaps between cement boards even to allow joint movement?

  • Are gaps filled with mastic?

  • Is mastic covered by movement tape DAFA?

  • Has the area been cleaned and waste including COSHH materials removed to allocated bins?

Comments

  • undefined

Inspected by

  • Lider

  • Witnessed by

  • Mace

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.