Information
-
Document number
-
Facade Type
-
Level
-
Elevation
-
Conducted on
-
Prepared by- Lider
CONTROL/CHECK
SFS substructure assembly check
-
Obtain and check site datums, grids and setting out points
-
Fixings in correct position
-
Studs/brackets fixed as per provided drawings
-
Correct type and number screws, bolts as per drawings
-
Screws in correct position at no more than 300mm apart?
EPDM
-
Check EPDM for tears and holes.
-
Check the EPDM surface is dry and clean before Novoproof Kleber FA/I (Flexbond Plus) application?
-
Is Kleber FA (Flexbond Plus) fully applied to the sealing surface with a spatula and at the correct width? (80~100mm)
-
Check EPDM interior/exteriors corners if sealed properly.
ROCKWOOL and Firestop
-
Is rockwool dry?
-
Rockwool installed as per provided drawings
-
After installation of rockwool: are all the gaps covered?
-
Is rockwool firestop free from damages?
Cement boards
-
CC Boards fixed
-
Screws grab into SFS structure?
-
Screws at correct centres in CC Boards
-
Are all gaps between cement boards even to allow joint movement?
-
Are gaps filled with mastic?
-
Is mastic covered by movement tape DAFA?
-
Has the area been cleaned and waste including COSHH materials removed to allocated bins?
Comments
-
undefined
Inspected by
-
Lider
-
Witnessed by
-
Mace