Information

  • Main Contractor

  • Site

  • Location
  • Conducted on

  • Prepared by

  • Drawings Used for Area being Assessed

  • Persons Carrying out work to Area being Accessed

SFS INSPECTION

  • Have the SFS been given status and passed by the architect?

  • Are the operatives using the correct fixings for track to concrete and installed at correct centres?

  • Have the works been completed to current revised SFS drawings and details?

  • Have the works been completed to the current outline specification and manufacturers specification?

  • Has the operative been given the relevant drawings and details to complete the works?

  • Has the wall been set out to the correct Gridline offset? In correct location?

  • Has the openings been formed in the correct location? Height and width?

  • Has deflection heads been installed correctly with the requirement movement allowance?

  • Are the operatives using the correct tek screws for installing studs?<br>

  • Are the openings being formed using the correct studs/compounds as per approved design?

  • Has stud compounds need fixed together at 300mm centres?

  • Is the wall constructed using the correct depth and gauge of studs/tracks?

  • Is the wall completed to a true line and level?

  • Has VB bracing been installed as required?

  • Has the studs been installed to suit cladding joint locations?

CEMENT BOARD / SEALED

  • Has the specified CP board been installed, type and thickness?

  • Is the 5mm joints around all edges?

  • Has the been 15mm left for floor deflection joints?

  • Has the correct number of fixings been installed to each board? 25nr

  • Are the boards installed in a stretcher bond fashion?

  • Has the intumescent mastic been installed with no gaps or holes?

  • Has the EPDM been installed to deflection joints and concrete interfaces?

  • Has the CP board been installed with no bumps, gaps and bows?

  • Have the screws been fixed correctly? Not overtightend into board

  • Is the been fixed correctly at deflection track from floor to floor? Fixed to track and not studs?

Inspection result

  • Result of the inspection

  • Site notes

  • Should you have any enquiries regarding this inspection report please contact M Clarke & Sons on 02825822500.

  • M. Clarke Representive

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.