Information
-
Document number
-
Facade Name
-
Elevation
-
Level
-
Conducted on
-
Prepared by- LIDER
Inspection and system handover
Brackets
-
Is the correct bracket used?
Anchor bolts
-
Is the correct size and length used?
-
Is the correct thread depth achieved past the marker?
Halfen channel
-
Is the T-bolt fully engaged in the halfen channel?
-
Is the T-bolt engagement indicator in the right position?
-
Are the correct fixings used? i.e. nuts; washers
-
Minimum of three threads above nut achieved?
-
Are the brackets setup as per drawings provided by AYGÜN?
-
Correct torque achieved?
-
Paint markers over bolt/nut/bracket?
Stick system
-
Obtain and check site datums, grids and setting out points
-
Have the frame elements been checked for damages?
-
Are frame elements installed within specified tolerances?
-
Are the correct fixings used as per provided drawings?
-
Are the gaps between frame elements within the specified tolerances?
Unitized system
-
Obtain and check site datums, grids and setting out points
-
Are the units engaged into brackets?
-
Are glass elements damaged
-
Gaskets condition
-
EPDM condition
-
Have the unit elements been checked for scratches, dents?
-
Are unit elements installed within specified tolerances?
-
Are the correct fixings used as per provided drawings?
-
Are the gaps between elements within the specified tolerances?
Gasket inspection
-
Ensure gasket is installed before panel/glass installation
-
Is the gasket free of damage
-
Is gasket free of foreign contaminants? i.e. oils, metal filings
-
Is the gasket continuously sealed?
Galvanised inspection
-
Check for out-of-tolerance concrete
-
Check for sharp edges and notch if necessary
-
All galvanised sheets installed as per provided drawings?
-
Are galvanized sheets installed within specified tolerances?
-
Are the correct fixings used and secured as per provided drawings?
-
Check galvanised sheet/concrete are clean and dry before sealing!
-
Are all edges sealed?
EPDM FA/I inspection
-
Check EPDM for tears and holes
-
Check for sharp edges (galv /alu corners, insulation nails etc.)
-
Check temperature and record for application. If necessary ensure heater is being used.
-
Check the application surface is dry and clean before Novoproof Kleber FA/I application?
-
Check the EPDM surface is dry and clean before Novoproof Kleber FA/I application?
-
Is Kleber FA/I fully applied to the sealing surface with a spatula and at the correct width? (40~60mm)
-
Is the EPDM notched with the right tools as per drawings?
-
Once the EPDM temporary fix to the surface is roller used to ensure full sealing?
-
Check EPDM interior/exterior corners if sealed properly.
Internal-External rockwool inspection
-
Rockwool stick pins quantity and distribution installed as per approved drawings?
-
Is the concrete surface dry?
-
Is rockwool dry?
-
After installation of rockwool: are the all the stick pins retaining washers engaged?
-
After installation of rockwool: are all the stick pins bend in order to not penetrate EPDM?
-
After installation of rockwool: are all the gaps covered?
-
Is rockwool free from damages?
Copings and flashings inspection
-
Obtain and check site datums, grids and setting out points
-
Have the coping/flashing elements been checked for scratches, and dents?
-
Are coping/flashing elements installed within specified tolerances?
-
Are the correct fixings used as per provided drawings?
-
Are the gaps between coping/flashing elements within the specified tolerances?
-
Mastic works done?
Glass inspection
-
Are glass panes compliant with manufacturers specifications?
-
Manufacturer's stamp in the correct position?
-
Damaged glass?
-
Are glass panes installed within the specified tolerances?
-
All toggles/pressure plates engaged?
-
Even distribution of glass over glazing shoes/glazing bead?
-
Are glass panes fixed and secure as per drawings provided ?
-
Mastic works completed?
Spandrel area
-
Spandrel area: glass panel engaged in all brackets?
-
Spandrel area: glass panel brackets secured with screws?
-
Spandrel area: all gaps even?
Atrium
-
After installation of Kerafix, are there visible gaps between glass panes?
Back panel inspection
-
Are the back panels manufactured as per drawings provided?
-
Paint damages?
-
Butyl tape installed prior to back panel insertion?
-
Are back panels installed within the specified tolerances?
-
Are back panes fixed and secure as per drawings provided ?
-
All the gaps around notched area closed?
-
Mastic works completed inside of back panel?
-
Is rockwool cut at the right size and installed inside back panel?
Fins inspection
-
Obtain and check site datums, grids and setting out points
-
Are the fin elements manufactured as per drawings provided?
-
Have the fin elements been checked for damages?
-
Are the correct fixings used and secured as per provided drawings?
-
Are fins installed within specified tolerances?
SFS wall inspection
SFS substructure assembly
-
Obtain and check site datums, grids and setting out points
-
Fixings in correct position
-
Studs/brackets fixed as per provided drawings
-
Correct type and number screws, bolts as per drawings
Cement boards
-
CC Boards fixed
-
Screws grab into SFS structure?
-
Screws at correct centres in CC Boards
-
Are all gaps between cement boards even to allow joint movement?
-
Are gaps filled with mastic?
-
Is mastic covered by movement tape DAFA?
EPDM
-
Check EPDM for tears and holes.
-
Check the EPDM surface is dry and clean before Novoproof Kleber FA/I (Flexbond Plus) application?
-
Is Kleber FA (Flexbond Plus) fully applied to the sealing surface with a spatula and at the correct width? (80~100mm)
-
Check EPDM interior/exteriors corners if sealed properly.
Rockwool
-
Is rockwool dry?
-
Rockwool installed as per provided drawings
-
After installation of rockwool: are all the gaps covered?
-
Is rockwool firestop free from damages?
GRC inspection
-
Are GRC panels manufactured as per drawings provided?
-
Check for damages!
-
Are GRC panels installed within the specified tolerances?
-
Are GRC panes fixed and secure as per drawings provided ?
Areas where firestop/rockwool is visible
-
Is OBEX strip installed on mineral wool at joint area?
Sub-frame inspection
-
Obtain and check site datums, grids and setting out points
-
Check subframe to be free of manufacturer's defects
-
Are subframe elements installed within specified tolerances?
-
Are the correct fixings used as per provided drawings?
-
Are the gaps between subframe elements within the specified tolerances?
Doors inspection
-
Obtain and check site datums, grids and setting out points
-
Have the door frame elements been checked for scratches, dents?
-
Are door frame elements installed within specified tolerances?
-
Are the correct fixings used as per provided drawings?
-
Are the gaps between door frame elements within the specified tolerances?
-
Are hinges in good working order?
-
Do doors move freely?
-
Are door handles installed?
-
Are door locking mechanisms operational?
-
FIRE DOORS: do emergency locking mechanisms open the doors?
-
All other door elements installed?
Balustrade inspection
-
Obtain and check site datums, grids and setting out points
-
Have the balustrade elements been checked for scratches, and dents?
-
Are balustrade elements installed within specified tolerances?
-
Are the correct fixings used as per provided drawings?
-
Are glass panes compliant with manufacturers specifications?
-
Manufacturer's stamp in the correct position?
-
Damaged glass?
-
Are glass panes installed within the specified tolerances?
-
Even distribution of glass over glazing shoes/glazing bead?
-
Are glass panes fixed and secure as per drawings provided ?
-
Are all gaps even?
-
Mastic works completed?
CORTEN inspection
-
Obtain and check site datums, grids and setting out points
-
Have the CORTEN elements been checked for scratches and dents?
-
Are CORTEN elements installed within specified tolerances?
-
Are the CORTEN hooks engaged and securely fastened?
-
Are the correct fixings used as per provided drawings?
-
Are the gaps between CORTEN elements within the specified tolerances?
Additional comments
-
undefined
Handover
-
Tested by
-
Witnessed by
-
Mace