Information

  • Document number

  • Facade Type

  • Level

  • Elevation

  • Conducted on

  • Prepared by- Lider

CONTROL/CHECK

  • Are GRC panels manufactured as per drawings provided?

  • Check for damages!

  • Is the mineral wool installed prior to GRC installation?

  • Is OBEX strip installed on mineral wool at joint area?

  • Are GRC panels installed within the specified tolerances?

  • Are GRC panes fixed and secure as per drawings provided ?

  • Has the area been cleaned and waste including COSHH materials removed to allocated bins?

Comments

  • undefined

Inspected by

  • Lider

  • Witnessed by

  • Mace

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.