Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Inspection Page
Equipment integrity
-
Fuel pipes to ME<br><br>Ensure pipes are in good condition, properly secured and supported with clams/brackets
-
Fuel pipes to generators<br><br>Ensure pipes are in good condition, properly secured and supported with clams/brackets
-
ME high-pressure fuel oil pipes<br><br>Confirm all high-pressure fuel oil pipes properly shielded and in satisfactory condition
-
AE high-pressure fuel oil pipes<br><br>Confirm all high-pressure fuel oil pipes properly shielded and in satisfactory condition
-
Pipe fittings<br><br>Confirm fittings in sound condition
-
Pipe valves<br><br>Confirm valves in sound condition
-
Pipe leading to the fuel tank<br><br>Confirm inspected and unclogged
-
Fire dampers<br><br>Confirm fire dampers functioning with proper sealing
-
ER fire alarm<br><br>Confirm fire alarm satisfactory functioning
-
Fixd firefighting system (e.g low pressure CO2)<br><br>Confirm functional and relevant relevant crew are well familiar with the release procedure
-
Fire doors and A60 insulations<br><br>Confirm inspected and in sound condition
Cleanliness
-
Cleanliness of ECR and ER<br><br>Check and confirm proper standard of cleanliness
-
Oil contamination in ME and AE<br><br>Check that insulation/lagging not contaminated or soaked in oil
-
Storage of readily combustable materials<br><br>Confirm stored only in designated areas
Leakages
-
ME fuel leak tank alarms<br><br>Check for leakages
-
AE fuel leak tank alarms<br><br>Check for leakages
-
ME LO sump tank<br><br>Check for leakages
-
ME fuel pump unit<br><br>Check for leakages
-
Cyliner oil service tank<br><br>Check for leakages
-
AE LO sump tank<br><br>Check for leakages
-
LT expansion tank<br><br>Check for leakages
-
ME fittings<br><br>Check for leaks at fittings
-
ME flexible hoses<br><br>Check for leaks in flexible hoses
-
AE fittings<br><br>Check for leaks at fittings
-
AE flexible hoses<br><br>Check for leaks in flexible hoses
Hot surfaces insulation
-
ME hot surfaces insulation/lagging<br><br>Ensure hot surfaces are properly covered with insulation/lagging
-
Hot surfaces above 200-220 deg Celcius<br><br>Check for “hotspot” on insulated hot surfaces that are above 200-220 deg Celsius
-
ME fuel pump unit<br><br>Ensure high pressure fitting connection is insulated with anti-splash tape
-
Expansion bellows<br><br>Ensure and confirm properly shielded with insulations intact and no signs of leak
-
Fuel oil pipes shielding<br><br>Ensure proper insulation/lagging
-
Turbo charger shielding<br><br>Ensure proper insulation/lagging
-
Purifier shielding<br><br>Ensure proper insulation/lagging
-
Bilge well shielding<br><br>Ensure proper insulation/lagging
-
Exhaust gas pipes shielding<br><br>Ensure proper insulation/lagging
-
Steam pipes shielding<br><br>Ensure proper insulation/lagging
-
Heat exchangers shielding<br><br>Ensure proper insulation/lagging