Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Inspection Page

Equipment integrity

  • Fuel pipes to ME<br><br>Ensure pipes are in good condition, properly secured and supported with clams/brackets

  • Fuel pipes to generators<br><br>Ensure pipes are in good condition, properly secured and supported with clams/brackets

  • ME high-pressure fuel oil pipes<br><br>Confirm all high-pressure fuel oil pipes properly shielded and in satisfactory condition

  • AE high-pressure fuel oil pipes<br><br>Confirm all high-pressure fuel oil pipes properly shielded and in satisfactory condition

  • Pipe fittings<br><br>Confirm fittings in sound condition

  • Pipe valves<br><br>Confirm valves in sound condition

  • Pipe leading to the fuel tank<br><br>Confirm inspected and unclogged

  • Fire dampers<br><br>Confirm fire dampers functioning with proper sealing

  • ER fire alarm<br><br>Confirm fire alarm satisfactory functioning

  • Fixd firefighting system (e.g low pressure CO2)<br><br>Confirm functional and relevant relevant crew are well familiar with the release procedure

  • Fire doors and A60 insulations<br><br>Confirm inspected and in sound condition

Cleanliness

  • Cleanliness of ECR and ER<br><br>Check and confirm proper standard of cleanliness

  • Oil contamination in ME and AE<br><br>Check that insulation/lagging not contaminated or soaked in oil

  • Storage of readily combustable materials<br><br>Confirm stored only in designated areas

Leakages

  • ME fuel leak tank alarms<br><br>Check for leakages

  • AE fuel leak tank alarms<br><br>Check for leakages

  • ME LO sump tank<br><br>Check for leakages

  • ME fuel pump unit<br><br>Check for leakages

  • Cyliner oil service tank<br><br>Check for leakages

  • AE LO sump tank<br><br>Check for leakages

  • LT expansion tank<br><br>Check for leakages

  • ME fittings<br><br>Check for leaks at fittings

  • ME flexible hoses<br><br>Check for leaks in flexible hoses

  • AE fittings<br><br>Check for leaks at fittings

  • AE flexible hoses<br><br>Check for leaks in flexible hoses

Hot surfaces insulation

  • ME hot surfaces insulation/lagging<br><br>Ensure hot surfaces are properly covered with insulation/lagging

  • Hot surfaces above 200-220 deg Celcius<br><br>Check for “hotspot” on insulated hot surfaces that are above 200-220 deg Celsius

  • ME fuel pump unit<br><br>Ensure high pressure fitting connection is insulated with anti-splash tape

  • Expansion bellows<br><br>Ensure and confirm properly shielded with insulations intact and no signs of leak

  • Fuel oil pipes shielding<br><br>Ensure proper insulation/lagging

  • Turbo charger shielding<br><br>Ensure proper insulation/lagging

  • Purifier shielding<br><br>Ensure proper insulation/lagging

  • Bilge well shielding<br><br>Ensure proper insulation/lagging

  • Exhaust gas pipes shielding<br><br>Ensure proper insulation/lagging

  • Steam pipes shielding<br><br>Ensure proper insulation/lagging

  • Heat exchangers shielding<br><br>Ensure proper insulation/lagging

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.