EROSION, SEDIMENT AND DRAINAGE INSPECTION
-
undefined
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Weather conditions
-
If an approved ESC plan is required it has been developed with a copy on site?
-
Have any changes to the ESC plan been
-
Has the extent of disturbance been minimised?
-
Are erosion and sediment controls installed, operating and maintained in accordance with the ESC plan and in a manner that controls erosion and sedimentation?
-
Is upslope clean water diverted away from the worksite?
-
Are drains or diversion banks installed and maintained to adequately control runoff water in a non-erosive manner?
-
Are bunds around washdown areas / shaker grids installed and maintained to contain runoff water?
-
Is the height of soil and mulch stockpiles less than 2m?
-
Do stockpiles and bare areas require additional protection?
-
Is material that is excavated being segregated into stockpiles dependent on soil horizons (i.e. grass, top soil, sub soil)?
-
Have adequate breaks been left for in soil stockpiles to accommodate overland surface flows (e.g. breaks every 50-100m, no stockpiles in drainage lines)?
-
Are public roads free of mud/soil or debris from vehicles?
-
If installed, are rumble grids, rock access points and wheel washes being maintained / cleaned effectively?
-
Is stabilisation and revegetation of exposed areas being undertaken promptly?