Title Page
-
Doc No.
-
Audit Title
-
Client / SIte
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Environmental Officer (EO) is available on site
-
Domestic waste should be segregated from construction waste.
-
Good housekeeping
-
Grease sump provided at Kongsi
-
Sullage & sewage channeled into septic tank
-
Sewage and sullage discharge not channel directly to silt trap / sediment pond without undergoing any treatment
-
Septic tank has adequate capacity to cater for sewage & sullage generated at site office and/or Kongsi
-
All scheduled wastes (SW) generated at the site have been labelled correctly
-
The storage area is properly ventilated
-
The roof for scheduled waste storage area is large enough to prevent rain water from entering the storage area
-
The storage area is fenced properly and locked
-
The storage area provided with concrete floor
-
The storage area are bunded containment to be 110% of the largest container stored in the storage area.
-
The bund is impermeable. (e.g the inside wall of the bund is plastered with concrete)
-
Scheduled waste containers are always closed.
-
Scheduled Waste stored not exceeding 180 days from date of generation or 20 metric tonnes.
-
All spillage on site are cleaned up immediately.
-
Chemical / oil spill kit available at the storage area
-
Information to be included at the container’s label: <br>• Date of Scheduled Waste first generated<br>• Name of waste generator <br>• Address of waste generator<br>• Telephone number of waste generator
-
ESCP available and approved by competent person (Professional Engineer / CPESC)
-
ESCP constructed as per approved drawings. All ESCP components are installed with approved sizing
-
Detention pond / silt trap properly maintained and desilted when reaching 50% capacity
-
Geotextile used for gabions and silt traps in good conditions
-
Perimeter earth drain constructed along the Project boundary
-
Slopes are turfed or provided with plastic sheets
-
Earth stockpiled protected by plastic sheets
-
Plastic sheets properly installed
-
Silt fence properly installed
-
Wash trough / wheel washing facilities provided at exit points
-
Water browser deployed
-
Drainage system cleared of sedimentation
-
Drainage system cleared of water ponding
Remarks
Completion
-
Checked by
-
Acknowledged by
-
Accepted by