  • Environmental Officer (EO) is available on site

  • Domestic waste should be segregated from construction waste.

  • Good housekeeping

  • Grease sump provided at Kongsi

  • Sullage & sewage channeled into septic tank

  • Sewage and sullage discharge not channel directly to silt trap / sediment pond without undergoing any treatment

  • Septic tank has adequate capacity to cater for sewage & sullage generated at site office and/or Kongsi

  • All scheduled wastes (SW) generated at the site have been labelled correctly

  • The storage area is properly ventilated

  • The roof for scheduled waste storage area is large enough to prevent rain water from entering the storage area

  • The storage area is fenced properly and locked

  • The storage area provided with concrete floor

  • The storage area are bunded containment to be 110% of the largest container stored in the storage area.

  • The bund is impermeable. (e.g the inside wall of the bund is plastered with concrete)

  • Scheduled waste containers are always closed.

  • Scheduled Waste stored not exceeding 180 days from date of generation or 20 metric tonnes.

  • All spillage on site are cleaned up immediately.

  • Chemical / oil spill kit available at the storage area

  • Information to be included at the container’s label: <br>• Date of Scheduled Waste first generated<br>• Name of waste generator <br>• Address of waste generator<br>• Telephone number of waste generator

  • ESCP available and approved by competent person (Professional Engineer / CPESC)

  • ESCP constructed as per approved drawings. All ESCP components are installed with approved sizing

  • Detention pond / silt trap properly maintained and desilted when reaching 50% capacity

  • Geotextile used for gabions and silt traps in good conditions

  • Perimeter earth drain constructed along the Project boundary

  • Slopes are turfed or provided with plastic sheets

  • Earth stockpiled protected by plastic sheets

  • Plastic sheets properly installed

  • Silt fence properly installed

  • Wash trough / wheel washing facilities provided at exit points

  • Water browser deployed

  • Drainage system cleared of sedimentation

  • Drainage system cleared of water ponding

Remarks

Completion

  • Checked by

  • Acknowledged by

  • Accepted by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.