Title Page
-
Job Number
-
General Contractor
-
Conducted on
-
Project Manager
-
Temperature
-
Location In Building
-
Confirm layout is square. Confirm door and window layout
-
Notes
-
Add media
-
Confirm all bottom track is anchored per plans and specs
-
Notes
-
Add media
-
Confirm track/slip drift track anchored per plans and specs
-
Notes
-
Add media
-
Confirm top track is plumb
-
Notes
-
Add media
-
Confirm C.J./E.J. layout per approved drawings, plans and specs
-
Notes
-
Add media
-
Confirm studs installed per plans and specs
-
Notes
-
Add media
-
Confirm E.J. framing per plans and specs
-
Notes
-
Add media
-
Confirm C.J. framing per plans and specs
-
Notes
-
Add media
-
Confirm backing at horizontal C.J./reveals, per plans and specs (if necessary)
-
Notes
-
Add media
-
Confirm door frames, windows and exterior grilles are framed out per plans and specs are plumb and true
-
Notes
-
Add media
-
Confirm bridging/blocking installed per plans and specs
-
Notes
-
Add media
-
Confirm exterior openings framed out per plans (Access doors, etc.)
-
Notes
-
Add media
-
Confirm wall studs are plumb and true
-
Notes
-
Add media
-
Confirm welding complete per plans and specs
-
Notes
-
Add media
-
Confirm stud welds painted per plans and specs
-
Notes
-
Add media
-
Confirm backing installed at lights, signage, roof flashing, etc.
-
Notes
-
Add media
-
Confirm backing installed for GFRC/FRP components that mount to walls or ceilings per plans and specs
-
Notes
-
Add media
-
Confirm framing signed-off prior to close-up
-
Notes
-
Add media
-
Confirm MEP trades signed-off prior to close-up
-
Notes
-
Add media
-
Sign Off
-
Forman
-
Q.C. Sign Off
-
Comments