Title Page
-
I.D.I. Job Number
-
Job Site Name
-
Conducted on
-
I.D.I. QAQC Inspector
-
Job Site Area of QAQC Inspection
-
Confirm for updated drawings, RFI's, plans & specs
-
Confirm structure components are within tolerance
-
Confirm bottom track is anchored per shop drawings, plans, specs, and fastener manufacturer's requirements
-
Confirm top track/deflection track is anchored per shop drawings, plans, specs and fastener manufacturer's requirements
-
Confirm top track is plumb with bottom track
-
Confirm stud gauge and installed per shop drawings, plans and specs
-
Confirm the gap from the bottom of stud to bottom of track and the gap from the top of stud to top of track is no more than 1/8"
-
Confirm proper clip/accessories installation per shop drawings, plans, specs, and fastener manufacturer's requirements
-
Confirm wall studs are plumb and within track
-
Confirm C.J./E.J. layout per shop drawings, plans and specs
-
Confirm temporary bracing (if required) and permanent bracing is installed per shop drawings, plans, specs, and MEP requirements
-
Confirm E.J. framing per shop drawings, plans and specs
-
Confirm C.J. framing per shop drawings, plans and specs
-
Confirm backing at horizontal C.J./reveals/termination bars (if required) are installed per shop drawings, plans and specs
-
Confirm door frames, windows, exterior grilles are framed out per shop drawings, plans and specs, and are plumb
-
Confirm horizontal bridging is installed per shop drawings, plans and specs
-
Confirm stud welds (if required) are painted per plans and specs
-
Confirm welding (if required) is completed per shop drawings, plans and specs
-
Confirm backing installed at lights, signage, roof flashing, etc.
-
Confirm screw pattern is per shop drawings, plans and specs
-
Confirm there are no knockouts within 10" of top or bottom track
-
Confirm cleanup of our cartons and scrap materials
-
Inspect and walk the site with G.C. Superintendent
-
Comments
-
Sign Off
-
I.D.I. QAQC Inspector