Title Page

  • I.D.I. Job Number

  • Job Site Name

  • Conducted on

  • I.D.I. QAQC Inspector

  • Job Site Area of QAQC Inspection

  • Confirm for updated drawings, RFI's, plans & specs

  • Confirm structure components are within tolerance

  • Confirm bottom track is anchored per shop drawings, plans, specs, and fastener manufacturer's requirements

  • Confirm top track/deflection track is anchored per shop drawings, plans, specs and fastener manufacturer's requirements

  • Confirm top track is plumb with bottom track

  • Confirm stud gauge and installed per shop drawings, plans and specs

  • Confirm the gap from the bottom of stud to bottom track and the gap from the top of stud to top track is no more than 1/8"

  • Confirm proper clip/accessories installation per shop drawings, plans, specs, and fastener manufacturer's requirements

  • Confirm wall studs are plumb and within track

  • Confirm C.J./E.J. layout per shop drawings, plans and specs

  • Confirm temporary bracing (if required) and permanent bracing is installed per shop drawings, plans, specs, and MEP requirements

  • Confirm E.J. framing per shop drawings, plans and specs

  • Confirm C.J. framing per shop drawings, plans and specs

  • Confirm backing at horizontal C.J./reveals/termination bars (if required) are installed per shop drawings, plans and specs

  • Confirm door frames, windows, exterior grilles are framed out per shop drawings, plans and specs, and are plumb

  • Has all insulation been installed to double studs at doors and box headers

  • Confirm horizontal bridging is installed per shop drawings, plans and specs

  • Confirm stud welds (if required) are painted per plans and specs

  • Confirm welding (if required) is completed per shop drawings, plans and specs

  • Confirm backing installed at lights, signage, roof flashing, etc.

  • Confirm screw pattern is per shop drawings, plans and specs

  • Confirm there are no knockouts within 10" of top or bottom track

  • Confirm cleanup of our cartons and scrap materials

  • Inspect and walk the site with G.C. Superintendent

  • Comments

  • Sign Off

  • I.D.I. QAQC Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.