Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Chassis & Floors

  • Fee of Broken and/or cracked stringers

  • Adhesive used on center stringers

  • Decking is secured and seams sanded smooth

  • Sub-floor properly prepped and cleaned

  • Proper glue pattern with no glue on seams

  • Linoleum is stretched and secured properly

Cabinet, Plumbing & appliance set

  • Vinyl floor cut clear from the furnace footprint and foiled

  • No strained Pex fittings or kinked braided hoses

Shelling

  • Slide-out openings are correct width and square with bracing

  • Hurricane strapping is being installed properly

  • AC ducting is secured and in proper placement for registers

Electrical

  • 12v & 110v wires routed and secured 4"-12" from connection

  • Metal sleeves and or smash plates used where needed

  • Solar controllers are hooked up correctly & tested

Metal / Fiberglass

  • Are adhesives being applied in the correct areas

  • Insulation is filling all cavaties

  • Proper staple pattern being used on metal install

  • Staples in all low mesa's along front radius

Decking

  • Proper amount of adhesive used on rafters

  • Decking is tight and secure

  • Decking seams / ceiling panel seams are minimum 16" offset

Rubber Roof

  • Decking free from all debris and raised splinters

  • Proper amount of glue is being used and distributed evenly

  • Proper amount of membrane overhang at front

  • Gutter rail is straight and butt joints are tight / sealed

  • Self-leveling is neat and thorough with no excess

  • Is Dicor pump clean and functioning properly

  • Is air pressure set correctly

Slide Outs

  • Slide box is square

  • Slide box is insulated properly

  • Steel sleeves are being installed for 110v Romex through studs

  • Wiper seals are installed square, tight and sealed

  • Wiring proper length & secured and away from pinch points

  • Adjustment marks are properly in place

  • Slide room has proper seal compression Front / Rear, is centered in opening, & has been cycled

Final

  • All screws and debris off flooring and cabinets clean

  • Wall attachments and slides sealed completely & w/o excess

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.