QUALITY INSPECTION - PRE WINDOW FABRICATION.
-
1. Check correct fabrication paperwork received from fabricators on completion.
-
2. Additional Information.
QUALITY INSPECTION - WINDOW FABRICATION.
-
3. Check that the window handed correctly and as per specification ( tilt turn top hung etc )
-
4. Check the joining / coupling bar been sealed and correct specification.
-
5. Check the drip bar is fixed and sealed if specified.
-
6. Check reinforcing bars if specified.
-
7. Check correct hinges ( size & type ).
Page 2/5
-
8. Check the Espag ( size and operation ).
-
9. Check the colour of handle.
-
10. Check for anti hinge device where specified.
-
11. Check inner and external gaskets fitted correctly.
-
12. Check glazing packers/supports to correct location & orientation.
-
13. Check glazing units positioned centrally within rebate and correct size.
-
14. Check beads are secure with external gaskets fitted (no excessive gaps.) & prep for drainage.
-
15. Check drainage paths clear.
-
16. Check operation of opening vents check that any necessary adjustments have been<br>carried out.
-
17. Check glazing fitted is the correct specification. The correct orientation eg Laminate to inside. The Solar control is on the correct face.
-
18. Check the EPDM bond / mechanically fixed to window. If specified.
-
19. Check window is prepped for air equalisation.
Page 3/5
-
20. Keys provided.
-
21. Protection. If specified.
-
22. Additional Information.
-
23. Additional Information.
-