Information
-
Site Address
-
Job Number.
-
Conducted on
-
Prepared by
-
Clients Attending
FINAL WALK THROUGH SHEET
-
Practical Completion Date
-
Hot water serial number ?
-
This is either gas or solar serial number is not required
ITEMS TO BE ADDRESSED
-
Please add information for items to be resolved
Add issue
-
Add media
-
Paint touch ups and minor defects as dotted to be rectified.
IMPORTANT INFORMATION
-
The Builder will carry out and complete the above listed rectification works as required within the date below
NB: Unless otherwise listed above all appliances & fittings i.e baths, mirrors, ovens, windows, bench-tops & wall and floor tiles, etc. were inspected and no faults were visually evident. -
Date of completed works (if not completed within time allowed supervisor must consult with your manager)
-
Are clients moving in to their home ?
-
Please add street number of home?
-
Are all contact details up to date and been provided to head office (if no please update contact information below)
-
Supervisor Signature
-
Clients Name & Signature