Title Page
-
Conducted on
-
Prepared by
-
Location
Pre-Start
-
Are drawings construction issued?
-
Has the fire barrier been kept in a dry protected area?
-
Have lines and levels been established?
-
Have the installers received siderise training?
Vertical RV
-
Have the vertical fire barriers been installed first?
-
Have the fire barriers been installed in the correct orientation?
-
Have the fire barriers been cut 10mm larger than the cavity to allow full compression?
-
Is the fire barrier flat to the backing structure not allowing any air to pass through?
-
Are the brackets 600mm max centres and 300mm in from each end for 1.2m lengths?
-
Are the brackets inserted into the fire barrier by 75%?
-
Are the fire barriers taped at the joints using siderise approved tape?
Horizontal RH
-
Have the fire barriers been cut along the cutting lines and maintained at 25mm (+/- 3mm) been maintained?
-
Are the fire barriers installed in the correct orientation i.e. the coloured line facing up?
-
Is the intumescent strip maintained constantly through the cladding
-
Have cuts into the fire barrier been cut neatly and taped?
-
Are the brackets 3no. per 1.2m at 400mm centres?
-
Are the end of brackets split and trimmed to 10-20mm?
-
Is the top side of the fire barriers taped and not over the face of the intumescent strip?
Fixings
-
Are the fixings to the latest fixing schedule?
-
Are all fixings used none combustible?
-
Have the brackets been pre drilled to allow for easier installation?
Sign off
-
A2O Manager Name and Signature
-
Subcontractors Representative Name and Signature