Information

  • Report type

  • Project

  • Conducted on

  • Report prepared by

  • Location

INSPECTION REPORT

  • Fire Door Fitted

  • Fire Door No.
  • Fire Door Installed

  • Location

  • Door Type

  • Push Bar Installed

  • Siren Installed

  • Mag lock Installed

  • Strobe light Installed

  • Locking Mechanism Secure

  • Galvanised Sheeting (External)

  • Door Width (Clear Opening)

  • Emergency Power Energized

  • Steel Frame Installed

  • Hinge Type

  • Building Work Required

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.