Inspection Information

  • Project Name:

  • Project Location:

  • Water Supplied By:

  • Purpose of Test:

  • Date and Time of Inspection:

Flow Test

Flow Test Readings

  • Tower level:

  • Tower low:

  • Static (psi):

  • Residual (psi):

  • Flow Hydrant:

  • Flow Hydrant
  • Size Opening: 2.5

  • Coefficient: 0.9

  • Pitot Reading (psi):

Hydrant Map

  • Map Type:

  • Drawn Hydrant Map:

  • Satellite Imagery Hydrant Map:

IMPORTANT

  • Do not design to the information provided on this form. The fire sprinkler design must account for the fluctuation in the water tower levels in accordance with NFPA 13. The adjusted pressure and flow information will be provided to you in a water flow test report. The water flow test report will be sent to the contact provided below by the Rockwall Fire Department within 5 working days from the date of this test.

Inspection Status

Additional Comments

  • Comments

Inspection Status

  • On-site Inspector:

  • Flow Test Inspection Status:

Acknowledgement of Receipt

  • Sprinkler Design Company:

  • Email Address:

  • Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.