Site plan

  • are boundary pegs found and correct on site plan

  • Is the house correctly sighted ... 1650 away for 450 eaves . Front and rear setbacks correct . 1m clear light for habitable rooms

  • are site boundaries correct on plan inc dimensions and degrees

  • is North correct orientation as per title and POS

  • are easements clear of batters , cuts and dwellings

  • are adjoining properties nominated and proximity to cuts away 45 degree from cut .

  • retaining walls away 500mm for cut 200mm for fill from boundary

  • services nominated , electrical pit noted on plan

  • is there a flood overlay , termites ... council property report ??

  • floor levels correct to site concept plan or set .

  • requirements of property report , MCP , planning requirements met

  • are batters clearly marked on plan

  • is BAL , wind speed and other info on front page

  • is info correct on bottom bar

  • are levels correct as per site plan

  • is all owner supplied info on this

  • Is titlle stamped

undefined

floor plan

  • are the dimensions correct or any missing

  • is the N arrow correct

  • are the m2 correct to concepts

  • double brick to garage openings for track , 150mm clear acees for rear garage door track ( 470 pier )

  • is cladding shown as 90mm walls and junctions corelate

  • wall bracing required , walls less that 450mm wide

  • do posts pitching beam align with wall for timber

  • does bath tub fit

  • island bench sink align and correct to concepts . Drainer handed correctly dw under drainer

  • door sizing correct to RFQ

  • in situ shower grate correct ( center ) shower base correct to Torbex standard

  • windows correct dimension and location

  • LOH to rooms smaller that 1800 long

  • stepdown height nominated . 170 step , no 20mm flooring bringing this overheight to 190mm

  • plaster cornice nominated

  • hws location correct , MB , gas ( no DP near gas ) HWS 12m max from outlet . .5 away from an openable window

  • bulkhead to roof pitching plates

  • bracing for pitched high ceilings

  • highlight windows fit in openings ( 100mm flashing on 30mm+30mm roof )

  • disbaility compliant . 870 doors , no step shower , nogging level garage floor

  • external timber door have cover alternative to fibreglass

window schedule

  • windows correct as per concept

  • glass correct . ie obscure ...etc

  • square set windows nominated 3mm offset reveals . timber reveal tile trim standard design

  • sliding doors correct as per plan

  • style correct ... aw , fix

roof layout

  • pitch correct as per concepts

  • ridges and hips align internal and external walls

  • roof vents nominated , bath showers , rangehoods

  • solar oriented correctly

  • stormwater drains correct to lopd and fall

  • SG under mechanical services ... taps , hydronic ( sewer ) , split systems

  • watertank overflow , pvc pipes leaf beaters sealed correct

  • stormy run ok ... no charged through slab . tank and pump as per engineering?

  • retaining walls nominated . Silt pits at every junction

  • ffls correct

  • box gutters correct location from end of chute

  • downpipes within 9lm connected as required

  • channel grate required or on plan 500mm away from garage

  • watertank power correct location . center for integral pumps 200l

Sewer plan

  • steps correct , egl FFL

  • shower base fall correct as per insitu and torbex .

  • plumbing voids ( double story ) correct

  • water tank slab step nominated

  • slab rebate detail correct , Raft , waffle .

brick plan

  • aj Correct min 6m 4m from corner

  • double brick to garage for door Min 150mm

  • bricks work brick or blockwork

  • ajs correct , front door aj . align with upstairs brickwork

electrical plan

  • power for appliances ... HWS , iso for splits . GLF

  • power points far away from basins ( 150mm ) bath (800mm)

  • power points as per marked up plan

  • phase of power correct

  • heat lights no fan required

  • switches on wrong side of door

  • no external lights in air.. eave light in eaves or wall mounted no eaves . not with a downpipe

  • conduit internal garage for brick walls

  • septic water tank power correct amperage

  • owner supplied items spec

flooring layout

  • external concrete note

  • wet area tiles nominated

  • owner supplied flooring ( before or after handover )

  • flooring thickness for step downs ok 190mm max

  • slab or footings to external

  • m2 nominated on external paving

  • channel grate required for garage fall

  • stair treads compliant

sectional drawings

  • does this marry orientation on floor plan

  • pitching beams nominated

  • stairs for double clear , open closed , balustrade, wall

  • heights ok 7;5 or other depending on planning , mCP

  • height on boundary

  • sectional deep stepdown shows frame to lower

  • stairs showing support or raked wall

  • eave dimensions correct

  • difinitive truss heights and allowance for truncated and battens roof 60mm . 100mm flashing under windows

elevations

  • heights ok

  • height on boundary ok

  • Plinth board nominated , t/ pine LOSP

  • garage door surround if cladding 185.32 losp with flashing

  • window orientation and sliding doors handing ok

  • cladding type and cavity nominated

  • pitching beam clear and visible

  • parapet note .. Height to be determined by roof and trusses . Height nominal .

  • downpipes correct as per roofing layout

  • material clearly nominated . render garage inc internal

  • overall height nominated

  • ceiling heights correct

  • slab height nominated .. 250 slab 450 waffle

  • orientation correct

  • final check that roof pitch is ok

  • garage door height correct 2100 for level entry design

sectional internals

  • bulkheads no dimensions just nominal sizes 715mm from benchtops

  • dishwashers under trays or correct location

  • tiles allowed to sides of walls 70mm from basins

  • range hood flues for raked

  • floor to ceiling tiles

  • shower screen door nominated

  • mixer heights for wall mounted correct 300mm from bench .

  • mixers , proximity correct for bathroom showers

  • robes correct as per sales and standard . Supports nominated

  • double hanging 2m high single 1.8

details

  • garaged door sections on plan

  • eaves and slab ok and correct as per plan

  • concrete driveway 25mm fall first meter nominated for level entry

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.