Title Page

  • Road Name

  • Conducted on

  • Prepared by

  • Operatives name

Untitled Page

  • ELM, correct figure of "8", 2 at top 3 at the bottom

  • OH, Fibre cable routed & dressed away from climbing steps (50mm), minimum bend radius maintained

  • OH, Fibre cable fixed to pole using aluminium strips with bonding nails & washers on each side of the pole at 450mm intervals, "C" clip 1x bonding & washer ensuring pinching/crushing of cable

  • OH, existing wire/cable across carriageway above 5.2m minimum climb height

  • OH, pole capping provided where required, not covering any pole markings

  • OH, ULW tree guard on fibre clamp where needed

  • OH/UG, CBT protective dust caps fitted & fully tightened on all ports

  • Corning CBT has the correct top & bottom mountings have been fitted and 2x cable ties

  • Are the cable ties cut flush?

  • Ate the GEL wraps fitted correct?

  • 144F/96F in 25mm/16mm sub duct?

  • Are the ducts cut back and sealed?

  • Has the worksite been left clean & tidy? Fibre shards removed/rubbish cleared?

  • Have any OR defects on site reported via A1024?

  • OR JUF2/JB26 & JB23 no cable support required

  • Potential L2C issues have been highlighted - i.e carrier pole not a "D" pole, trees, toby placement

  • CBT 150 max distance from furthest UPRN entry point (UG/Pole)

  • Is there any equipment on policy "D" poles

  • Have DILOR/road crossing issues considered and identified?

  • Have all AGG, DN, IJ nodes & CBTs correctly marked with the ID using permeant marker pen (gold/white)

  • Are the sub duct & fibre cables correctly supported & restrained. Minimum bend radius maintained?

  • Are the fibre cable pole to UG 3 to 4 metres coiled, supported & restrained in nearest FW/JUF chamber?

  • Is the MOBRA bracket fitted tight & at the top of the chamber?

  • MOBRA arm end cap or black/yellow tape?

  • Corning CBT 150mm clearance from ports

  • SST cable, yellow tape 350mm apart

  • Are the fibre cables entering AGG, DN, & IJ nodes correctly labelled?

  • Sub duct/Fibre cable, in OR chambers poles correct PIANOI number?

  • Any more than 25mm of sub duct/ fibre cable, extra PIANOI number?

  • OH, ELM/NJ node correctly fitted in bottom pole envelope of space?

  • OH, CBT fitted in top envelope of space?

  • I can confirm that this is a true reflection

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.