Information

  • site name and location of foundation pour by grid number

  • Conducted on

  • Checked by

Boxing dimensions

  • Do the boxing dimensions match the plans?

  • What grid has been used to check the foundation set out ?

  • How do you know this grid is accurate

Reinforcing steel

  • Is the reinforcing steel grade as per the drawings?

  • Is the reinforcing steel installed as per the drawings?

  • Dose the reinforcing steel have the correct cover?<br>Check specifications in in sure.

Dowells

  • How many dowels are on the plans for this pour?

  • Are there the correct amount of dowels in the foundation pour ?

  • Dose the Dowell set out match the drawings?<br>Are they in the correct position?

  • Are the dowels set to the correct height?

Hold down bolts

  • How many hold down bolts are on the plans for this pour?

  • Is there the correct amount of hold down bolts in the foundation pour?

  • Hold down bolt height is critical. What height is shown on the drawings?

  • Have the hold down bolts been installed to the correct height noted above from the drawings?

Floor slab starters

  • Confirm that all floor slab starters are installed as per the sections and elevations? Check drawings if in sure

Services

  • What services can you see in the foundation pour?

  • Are all the services installed?

  • Have there locations been checked?

General notes and misanalysis items to be checked

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.