Frame Assembly
-
Conducted on
-
Prepared by
-
Location
-
Operators
-
Reference SOPs DI004 - DI018 - DI036
Frame Assembly
-
Correct components selected and placed in jig correctly
-
100% Glue coverage on all joints
-
All cross laths positioned centrally and stapled correctly to blocking, 2 evenly spaced staples.
-
Chipboard top rail positioned and stapled correctly, 5 staples each side. (Drawer Divan)
-
Top and bottom rails positioned and stapled correctly, 3 evenly spaced staples.
-
Caliper board positioned and stapled correctly, 2 extra staples in each corner, 50mm around the edge and 150mm across the cross laths.
-
100% Glue coverage and jigs ueds to poisition drawer cross laths, 2 staples evenly spaced each side.
-
Frames stacked correctly wood to wood and card to card.
Audit Complete
-
Add signature