Have all walls been plumbed
-
Have all walls been fixed correctly at wall junctions
-
Does each frame have correct amount of fixings to slab or sub base
-
Have over and under straps been positioned either side of external openings, and at no greater intervals along frame than 1800 mm
-
Has all strap bracing been correctly installed according to plan
-
Has all brace board been fixed correctly with appropriate nail spacings
-
Has stairwell been identified and appropriate barriers installed
-
Have all lintels been installed according to plan, have correct lintel sizes been used
-
Have internal bracing walls been tied to external wall at wall junction in correct manor
-
Have all openings internal and external been checked for position and width according to plan
-
Have top plates been installed where required , and fixed correctly
Roof frame
-
Have all hangers or bottom chord stabilizers been installed according to truss layout
-
Are all top chord stabilizers installed as shown on truss layout
-
Check all speed brace is fixed in correct position
-
Check all triple grips are installed in appropriate fixing positions
-
Have truss ties been installed
-
Have triple grips or slip blocks been fixed to any saddle trusses
-
Check all ceiling joists are installed where required
-
Check that any hip end nogging is in place where required
-
Have all required frames been tied to roof frame with L grips
-
Has manhole been installed and area identified
-
Have Perlins been installed at correct spacings
-
Have perlins been tied or screwed down in appropriate places
-
Have facias been installed to accommodate correct eave width
General
-
Is all site rubbish in bins or positioned on site as not to cause a hazard
-
Is any spare timber stacked appropriately on site as not to interfere with following trades
-
General comments
-