Information
-
Facility inspection (Done at the start of each shift), choose shift.
-
Inspection Date
-
Inspection Report prepared by
- Peter Angon
- Badr Elkannoussi
- Abdullahi Kerow
- Randy Pemberton
- David Thrift
- Fausto Luna
- Francis Mabier
Tank levels
-
T1Computer
-
T2 Computer
-
T3 Computer
-
T4 Computer
-
T5 Computer
Facility Inspection
-
Well level
-
South perimeter fence secure?
-
Enter details
-
East perimeter fence secure?
-
Enter details
-
Add media
Tank 5 shift inspection
-
T5 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves for PRV's for each of the above valves
-
North perimeter fence behind T5 secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 4 shift inspection
-
T4 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves for PRV's for each of the above valves
-
North perimeter fence behind T4 secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 3 shift inspection
-
T3 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves for PRV's for each of the above valves
-
North perimeter fence behind T3 secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 2 shift inspection
-
T2 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves for PRV's for each of the above valves
-
North perimeter fence behind T2 secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 1 shift inspection
-
T1 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves for PRV's for each of the above valves
-
North perimeter fence behind T1 secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Emergency Generator
-
Fuel tank level
-
West perimeter fence secure.
-
Enter details
-
Add media
Main Delivery Valve
-
Main delivery valve status
-
Add media
Delivery Pumps and Vessels
-
DP1 Oil level
-
DP1 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP2 Oil level
-
DP2 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP3 Oil level
-
DP3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP4 Oil level
-
DP4 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP5 Oil level
-
DP5 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
DP6 Oil level
-
DP6 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Receiving Vessels
-
Mic. 1 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Mic. 2 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Mic. 3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Clay 1 Differential pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Clay 2 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Clay 3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
F/S 1 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
F/S 2 Differential Pessure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
F/S 3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Main Receiving Valve
-
Main receiving valve status
-
Add media
Comments or Remarks
-
Record maintenance and/or safety related items here (also report to your Lead or Supervisor):