Information
-
Facility inspection (Done at the start of each shift), choose shift.
-
Inspection Date
-
Inspection Report prepared by
- Peter Angon
- Badr Elkannoussi
- Abdullahi Kerow
- Randy Pemberton
- David Thrift
- Fausto Luna
- Francis Mabier
Tank levels
-
Tank 109
-
Tank 108
-
Tank 111
-
Tank 114
-
Tank 115
Facility Inspection
-
UST level
-
South perimeter fence secure?
-
Enter details
-
North Perimeter fence secure?
-
Enter details
-
Add media
Tank 108 shift inspection
-
Tank 108 Verec
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves.
-
Perimeter fence secure next to tank?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 109 shift inspection
-
Tank 109 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves.
-
perimeter fence next to Tank secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 111 shift inspection
-
Tank 111 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves?
-
perimeter fence next to tank 111 secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 114 shift inspection
-
Tank 114 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves?
-
Perimeter fence secure next to tank?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Tank 115 shift inspection
-
Tank 115 Varec level
-
Receiving valve status
-
Transfer valve status
-
Test Stand valve status
-
Delivery valve status
-
Stripper valve status
-
Sump valve status
-
Upstream and Downstream valves?
-
Perimeter fence next to Tank 115 secure?
-
Enter details
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Emergency Generator
-
Fuel tank level
-
North ops perimeter fence secure.
-
Add media
-
Enter details
Main Delivery Valve
-
Main delivery valve status
-
Add media
Delivery Pumps and Vessels
-
HPP1 Oil level
-
HPP2 Oil level
-
HPP1 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
HPP2 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
HPP3 Oil level
-
HPP3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
HPP4 Oil level
-
HPP 4 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
HPP5 Oil level
-
HPP5 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
HPP6 Oil level
-
HPP6 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Receiving Vessels
-
Mic. 1 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Mic. 2 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Mic. 3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Clay 1 Differential pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Clay 2 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Clay 3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
F/S 1 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
F/S 2 Differential Pessure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
F/S 3 Differential Pressure
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Comments/Remarks (leaks, maintenance or safety issues):
-
Add media
Main Receiving Valve
-
Main receiving valve status
-
Add media
Comments or Remarks
-
Record maintenance and/or safety related items here (also report to your Lead or Supervisor):