Title Page
-
Document No.
-
Audit Title
-
Conducted on
-
Personnel
Fun Walls G.S.E Monthly Checks
Structure Support System
-
Safe to continue?
Face of the climbing wall
-
Safe to continue?
Tyre's Support System
-
Safe to continue?
All Signage
-
Safe to continue?
Fun Wall O.P.P.E Monthly Checks
Auto Belay Lines
-
Safe to continue?
Anchor Points
-
Safe to continue?
Pulley's
-
Safe to continue?
Hydraulics
-
Safe to continue?
Electronic Systems
-
Safe to continue?
Carabiners
-
Safe to continue?
All Restriction Access Bar
-
Safe to continue?
Compressor System
-
Safe to continue?
Plastic Tube / Cable Protectors
-
Safe to continue?
Climbing Shoes
-
Safe to continue?
Tires and Ropes
-
Safe to continue?
-
Activity Specialist
-
Activity Leader
-
All checks must be ticked and signed by the trained instructor who carried out that specific check. A zone specifically trained Team Leader, or if not present, a Zone Specifically trained Duty Manager must sign off the sheet as a whole, and the Team Leader specific checks also. If any of the following fail, and the risk from this is not managed/ controlled, or deemed acceptable risk, the site is not suitable for opening. All issues must be reported to the Duty Manager. Site Layout sheets are available for visual diagrams of area specific issues. All daily checks must be completed before opening.