Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Audit Test

1.0 - General

  • 1.1 - Has the last inspection been reviewed?

  • 1.2 - Are there any outstanding actions?

  • 1.3 - The Company’s health and safety policy statements are signed and in date?

  • 1.4 - All statutory health and safety posters, signs and notices are displayed within the workplace?

  • 1.5 - Management and employees can demonstrate their familiarity with the Company's safety policies, procedures and safety instructions?

  • 1.6 - All appropriate risk assessments have been completed and are available on site?

  • 1.7 - Risk assessments have been completed and signed as accurate by the Director responsible?

  • 1.8 - Where risks have been identified, have suitable and sufficient control measures been put in place to prevent exposure or reduce the risk to the lowest possible levels practicable?

  • 1.9 - Have risk assessments been communicated to the relevant employees?

  • 1.10 - Have risk assessments been completed for specific individuals where applicable e.g. young workers, expectant mothers?

  • 1.11- Have safe work instructions / procedures been drawn up where required?

  • 1.12 - Have SWI’s / SWP’s been communicated to all relevant employees?

  • 1.13 - Is there a near miss system in place and proactively used?

  • 1.14 - All lighting both internally and externally is in good condition and working correctly?

  • 1.15 - Ventilation is adequate - either natural or artificial?

  • 1.16 - The workplace is clearly segregated into working, storage and walkways with floor markings where applicable?

  • 1.17 - Good segregation between vehicles and pedestrians which is monitored?

  • 1.18 - Adequate facilities provided to rest and eat meals?

  • 1.19 - Adequate welfare facilities with hot and cold running water, hygienic and in a good state of repair?

  • 1.20 - System is in place to inspect driving licences every 12 months, copies of licences are available for inspection?

2.0 - Chemicals

  • 2.1 - Only authorised chemicals are used?

  • 2.2 - An inventory of all chemicals and substances used on site has been completed and is readily available?

  • 2.3 - Are there MSDS on site on for all chemicals?

  • 2.4 - Is there completed COSHH on site for all chemicals?

  • 2.5 - Are the COSHH assessments signed and in date?

  • 2.6 - Are all chemical containers labelled correctly?

  • 2.7 - All chemicals and substances are stored in designated areas, which are suitable and secure?

  • 2.8 - Are all spill kits, drip trays and bunded trays fully available and in full operation (clean and not overfilled)?

  • 2.9 - Appropriate health checks / health surveillance is being completed to the required frequency and for the<br>appropriate employees?

  • 2.10 - Hazardous waste is correctly controlled, with the site registered as required. Waste transfer / consignment notes etc. being used and available for inspection?

3.0 - Electrical

  • 3.1 - All portable appliances supplied by or used by employees and contractors are safely stored within designated areas?

  • 3.2 - Electrical equipment found to be in good working order, with no defects noted?

  • 3.3 - Fixed wiring examination has been completed, certificate available and appropriate action taken as necessary?

4.0 Machinery/Equipment

  • 4.1 - Is all plant and machinery used on site in good working order and regularly serviced and maintained as required?

  • 4.2 - Have all employees received the appropriate level of training for the machinery and equipment being used and are records available?

  • 4.3 - Visual and documented inspection in place for all machinery and equipment including the checking and testing of guards and safety devices are in place?

  • 4.4 - All guards and safety devices fitted as required, in good condition and use enforced on relevant machinery and equipment?

  • 4.5 - Are lockout procedures implemented and followed?

  • 4.6 - Are noise levels controlled?

  • 4.7 - Are start and stopping devices within easy reach of the operator?

  • 4.8 - Are machines seen to be operated safely?

  • 4.9 - All employees are aware of and adopt the system in place for isolation, reporting of and repair of faulty machinery and equipment?

  • 4.10 - Safe working limits are clearly marked on all lifting equipment?

  • 4.11 - Manual handling equipment (e.g. pallet trucks, trolleys, carts etc.) are available, in good state of repair and used?

  • 4.12 - Are Fork Lift truck operators all trained?

  • 4.13 - Have FLT operators medicals been carried out?

  • 4.14 - Are before use checks being carried out on the FLT’s?

  • 4.15 - Do FLT’s in use appear to be serviceable and in a good condition?

  • 4.16 - All hand tools are serviceable and fit for purpose?

  • 4.17 - Power tools are checked for serviceability before use and appear in good condition?

  • 4.18 - Have vibration levels been determined and control measures put into place?

  • 4.19 - Where LEV’s are in place are they being checked for serviceability on a 14-monthly basis?

  • 4.20 - Is a ladder register available on site with all ladders annotated?

  • 4.21 - Are ladders in good condition?

  • 4.22 - Are ladder inspections being conducted and recorded?

  • 4.23 - Are ladders centrally located and secure?

5.0 PPE

  • 5.1 - All appropriate PPE for the tasks undertaken either on or off site is available, in good condition and stored correctly?

  • 5.2 - PPE provided is observed being used correctly?

  • 5.3 - The issuing of work wear and PPE is documented with records available?

6.0 First Aid

  • 6.1 - Has a first aid needs risk assessment been completed for the site, available for inspection, in date and control measures in place?

  • 6.2 - Adequate first aid boxes and eye wash stations and employees are aware of their location?

  • 6.3 - Are first aid boxes readily available?

  • 6.4 - Are the first aid boxes checked on a monthly basis for contents?

  • 6.5 - Suitable numbers of first aiders and appointed persons to cover the working arrangements and annual leave/sickness?

  • 6.6 - All employees and contractors understand the procedure for summoning first aiders in the event of an accident?

7.0 Housekeeping

  • 7.1 - There is a 'clean as you go' system in place which is evident?

  • 7.2 - Employees are aware of what cleaning equipment is available and it is evidently used?

  • 7.3 - Are all floors, passageways and stairs free from slip, trip and others hazards?

  • 7.4 - Floor surfaces both internally and externally are in a good state of repair?

  • 7.5 - Goods are stored in a manner whereby safe manual handling can be followed?

  • 7.6 - Is waste regularly emptied and not overloaded?

  • 7.7 - Is there a waste management plan in place?

8.0 Training

  • 8.1 - All employees have received Company health and safety induction and records are accurate and available?

  • 8.2 - All employees have been trained on appropriate safe systems of work for their work and records are available?

  • 8.3 - A system / training matrix is in place to identify and complete refresher training?

  • 8.4 - Employees have received manual handling training and records are available?

  • 8.5 - Good manual handling techniques observed during the audit?

  • 8.6 - Accident book is available on site and data protection compliant?

  • 8.7 - Employees are aware of the procedure to follow in the event of an accident?

  • 8.8 - Have Management led the investigation of accidents within the site and documented findings including all supporting evidence?

  • 8.9 - Management aware of RIDDOR reporting requirements and notifications have been made where applicable?

9.0 Contractors

  • 9.1 - A contractor / visitor register is available on site and completed. Site rules, emergency procedures provided at the time of signing in?

  • 9.2 - Managers are fully aware of their responsibility to manage contractors, competent to identify breaches in safe systems of work and will intervene where necessary?

  • 9.3 - Have all contractors been assessed for competency and approved?

  • 9.4 - A permit to work system is in operation, with previous permits issued available for inspection?

10.0 Fire

  • 10.1 - Is there a fire risk assessment in place for inspection and have all control measures identified been implemented?

  • 10.2 - Fire drills and fire awareness training completed in line with fire risk assessment and evidence available for inspection?

  • 10.3 - Fire safety appeared to be managed with no fire hazards noted? (combustibles, storage, blocked exit routes, defective fire doors etc.)

  • 10.4 - Is the fire alarm tested weekly and recorded in the fire log book?

  • 10.5 - Is the emergency lighting checked monthly and recorded in the fire log book?

  • 10.6 - Are weekly and monthly checks of the fire extinguishers conducted and recorded in the fire log book?

  • 10.7 - Are escape routes unobstructed?

  • 10.8 - Is the location of the fire assembly point on display?

  • 10.9 - Are emergency evacuation procedures on display?

11.0 Asbestos

  • 11.1 - Has an asbestos survey been carried out?

  • 11.2 - Is there an asbestos management plan in place (where applicable)?

  • 11.3 - Is the Management plan being correctly managed on an annual basis?

12.0 Offices

  • 12.1 - Is all office furniture (chairs, desks etc) fit for use?

  • 12.2 - Have Display Screen Equipment (DSE) assessments been carried out?

  • 12.3 - Have actions off the DSE assessments been completed?

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.