Title Page
-
Site conducted
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Premise / Structure (Site 1: Workshop, Plant room, Grounds)
-
No evidence of structural damage (hole in walls) to allow entry of pest / vermin
-
Grounds maintained to minimise harbourage of pests. No overgrown grass, weeds, storage of equipment is controlled & away from production facility
-
External walls are clean & in good repair (no mould build up evident)
-
Access to roof is restricted to authorised personnel only
-
Perimeter fence is secure with no evidence of damage / holes to allow unauthorised access
-
Walls and ceiling are free of damage &/or leaks
-
Paint surfaces free of flaking paint
-
Floor surfaces / coving in good repair and free of damage
-
Lights in plant room & workshop are covered, in working order with no damage evident
-
Food grade lubricants labelled and correctly stored
-
Electrical room doors locked and free of debris / pest activity
-
Cleaning of maintenance workshop & floor is maintained. Area is free of waste build up, cobwebs &/or metal shavings that may enter production zones
Verification Activity
-
Maintenance Paperwork - On completion of maintenance work sign off from both production & maintenance staff is evident to ensure area is clean & free of foreign contaminants?
-
Maintenance Toolboxes - Toolbox cleanliness is maintained with no evidence of gross build up, loose grease &/or lubricants.