Information
-
Document No.
-
Switchyard Inspection Checklist
General
-
Time
-
ITP Inspection
-
Inspection Type
- Work to Go
- Punchlist Inspection
- General
- Punchlist Signoff
- Complience
- Final Handover
-
Basic Location
- Access Roads
- EPCM
- Overland Conveyor
- ROM Reclaim
- ROM Transfer Pad
- MIA
- Raw Coal Stockpiles
- CV-045
- TS-044
- CV-008
- General Surface Aress
- MSF
- M&M Drift
- Mainteck Offsite Yard
-
Specific Location/s
-
Attendees
- Jared Nitschke
- Mark Sanders
- Bruce Johnston
- Patrick Doody
- Wylie Pearson
- Grant Porter
- Dave Middleton
- Phil Adlam
- Tony Pereria
- David Seaver
- Brett Heycox
- Andrew Marriott
- Michael Ross
- Deon Cordie
-
Other Attendees
Earthing
-
Earth Grid?
-
Notes
-
Photos
-
Structural Earths
-
Notes
-
Photos
-
Step & Touch Measurements
-
Notes
-
Photos
-
Fences & Gates Earthed
-
Notes
-
Photos
-
Earthed Platforms for Switching
-
Notes
-
Photos
Oily Water Separator
-
Installed?<br>
-
Notes
-
Photos
-
Access for Maintenance
-
Notes
-
Photos
Security Fence
-
2500mm Min Height
-
Notes
-
Photos
-
50mm Ground Clearance
-
Notes
-
Photos
-
Top 500mm = Min 4x150mm apart (max) Strands of Barbed Wire
-
Notes
-
Photos
-
Access gates locked
-
Notes
-
Photos
Signage - as per Australian Safety Sign Standard AS1319
-
Warning : Lettering 12mm (min) containing 'DANGER - HIGH VOLTAGE'.
-
Notes
-
Photos
-
Danger - bold letters 40mm (min) containing 'DANGER - HIGH VOLTAGE' and<br>'Authorised Persons Only'
-
Notes
-
Photos
-
Notice advising highest voltage rating of equipment within the switch yard.
-
Notes
-
Photos
Blue Metal Rock
-
Size: 40mm Screenings
-
Notes
-
Photos
-
Depth: Screening depth 100mm (min)
-
Notes
-
Photos
-
Area covered 1 mtr past the fence line & 1 mtr past the gates open @90deg.
-
Notes
-
Photos
Access
-
Steps into deep bunds and on access platforms
-
Notes
-
Photos
-
Gates fitted in handrails or access steps
-
Notes
-
Photos
Handrails
-
Fall protection around the perimeter of deep bunds, and as required.
-
Notes
-
Photos
Platforms
-
Decking in place and secured.
-
Notes
-
Photos
Grates
-
Grates fitted to sumps
-
Notes
-
Photos
-
Grates fitted to drains
-
Notes
-
Photos
Equipment
-
Equipment Description
-
FAT Documentation Available?
-
Notes
-
Photos
-
Equipment Fasteners: Two threads clear of nut (min)
-
Notes
-
Photos
-
Grout: Sufficient grout under equipments?
-
Notes
-
Photos
-
Earthing
-
Notes
-
Photos
-
Cable numbers in place?
-
Notes
-
Photos
Inspector
-
Inspector
- Jared Nitschke
- Mark Sanders
- Bruce Johnston
- Patrick Doody
- Wylie Pearson
- Grant Porter
- Dave Middleton
- Phil Adlam
- Tony Pereria
- David Seaver
- Brett Heycox
- Andrew Marriott
- Michael Ross
- Deon Cordie
-
Signature