Information

  • Audit TitleHoist, Crane & Derricks Safety Inspection

  • Client / GC

  • Project Name

  • Conducted on

  • Inspector

  • Location
  • Subcontractors on site

  • Add drawing

Hoist, Cranes, & Derricks

  • Operator certification and crane annual inspection maintained in file

  • Daily crane inspections properly completed by operator

  • Fire extenguisher

  • Qualified operator

  • Competent person rigging, using proper rigging

  • Lift areas barricaded & secured

  • Safety latches functioning

  • Equipment alarms functioning

  • Qualified signal person demonstrating proper signaling practice

  • Load charts available for equipment

  • Outriggers being properly used with adequate blocks

  • Overhead power lines deactivated or marked and adequate distance maintained

  • Rigging in proper working condition

  • Rigging not in use stored properly

  • Project Manager

  • Superintendent

  • Other Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.