Title Page

  • Conducted on

  • Prepared by

  • Location
  • Has the hot MBWA been completed by TLK/KM by 10.30am. Hs it been checked by GM?

  • Before working on the hot section was calibration done?

  • Correct members/numbers of team scheduled, 3 for smaller shops / 4 for larger shops

  • Is the hot production sheet in use?

  • Was the hot section set up for success, did you have the right level of ingredients?

  • Is the finished Potsoup weight correct?<br>Katsu Chicken Rice 52(+/-3), Satay Chicken 55(+/-3), Spicy Korean Pork 68 (+/-3) ,Classic Chicken Noodle 131(+/-5)

  • Was preparation done up pre opening the section, eg Soup Cups / G&G as required...

  • All products have been cooked as per HTC, and reaching temperature?

  • Open up 3 dishes and check how2, look for rice qty & protein qty in particular. 2 Potsoups /1 Udon & 1 rice

  • Hot Pass set up as per planogram & par levels in use? Check the tags are written on.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.