House Keeping / Emergency Equiment
-
Are areas clear, hygienic and free of slip / trip hazards
-
Caps on reinforcement bars and star pickets
-
Are materials stored correctly & within used by dates
-
Are access ladders & stairs in good condition
-
Access routes and exits clear
-
Is installed fire equipment maintained & adequate
-
Are first-aid kits available & maintained
-
Are workers aware of emergency procedures, emergency response personnel and emergency equipment onsite
-
Is clean drinking water readily available
Personal Protective Equipment (PPE)
-
Is safety footwear worn
-
Are hard hats worn where required
-
Is hearing and eye protection worn where required
-
Are respirators being worn where required
-
Are high visibility clothing worn where required
-
Is correct PPE readily available to all including visitors
Plant & Equipment Safety
-
Is all moving machinery & nip points guarded / quick hitch safety pins in place
-
Are all lock out devices operating
-
Are plant per-starts completed daily
-
Is all defective plant and equipment tagged out
-
Have SPF 08.2 & SPF 08.3 been completed for all hire plant on site
-
Do operators hold appropriate certificates and/or licences
Electrical Safety
-
Is electrical equipment tested & tagged
-
Where required, are leads elevated
-
Is electrical equipment free of water, heat sources & cutting points
Excavations & Confined Spaces
-
Is the required access permit held
-
Are all openings barricaded
-
Are all excavations correctly battered / shored
-
Is access and egress provided
-
Are spoil heaps clear of excavation
-
Has water been removed for excavation
Hazardous Materials
-
Are all hazardous materials clearly labelled
-
Are all Safety Data Sheets readily available & registered
-
Is material stored in the correct location
-
Storage areas designed to contain spills
Working From Heights
-
Are heights clear of power lines
-
Scaffolds - Fully boarded, guard rails and toe boards
-
Are ladders tied off, angled correctly (1 in 4) & extend 1m above landing
-
Working at heights equipment is inspected prior to use
SWMS / JSA’s / Safety procedures
-
Workers are involved in SWMS/safety procedure development & they are site specific
-
Project risk register up to date
-
Reviews of SWMS or safety procedures carried out during inductions, prestart and safety meetings where required
-
Health surveillance or exposure monitoring in place where required
-
Are workers inducted in SWMS applicable to their allocated tasks
-
Are Task Observations being carried out regularly
-
Are manual handling aids used where applicable
-
Attach Task Observation and JSA to this checklist as evidence
Environmental Controls
-
Are dust control activities effective
-
Are sedimentation controls effective
-
Is emergency spill kit on site
-
Waste disposed of correctly and records kept
-
Is noise on site managed appropriately
-
Waste disposed correctly and records kept
-
Workers aware of cultural heritage areas on site
Quality Controls
-
Are ITP’s used, up to date and records fully traceable
-
Are applicable documents controlled in accordance with SP05
-
Are variations and extensions of time registered, evidence filed
-
Are meetings minuted, distributed & records on file
General
-
Are all required access & other permits held
-
Safety signage and CivilTeam site signs in place <br>
-
All above ground and underground services identified
-
All applicable management plans and procedures are up to date & all associated documents in Dropbox (e.g. safety plans, contractors SWMS, site safety rules, sediment & traffic control plans etc)
-
Hazard observation booklets being used
-
Incidents & non-conformances reported
-
Have all been site inducted in accordance with SP 09
Other (Project Specific)
-
Corrective Action
-
Details of Corrective Action
-
Risk Rating
-
Person Responsible
-
Status
-
Due Date
Sign Off Completed Checklist
-
Inspector sign off
-
Inspection participants sign off (if applicable)