Information
-
Site conducted
-
Name of Site
-
Who is the Principal Contractor?
-
Date Audit Conducted on
-
Prepared by
-
What are the main activities that are being carried out today?
-
Location of Work Areas
-
Site Manager/Supervisor
-
How many people are on site today
Previous Audit
-
Has the previous audit been closed out?
-
Are there any repeat items from last report?
Site Set Up
-
Is the site secure? (hoarding, signage, public)
-
Is there an established Construction Phase health and<br>safety Plan on site<br>
-
Is there a Refurbishment and Demolition Asbestos Survey on site<br>
-
Is there an established Demolition Plan on site<br>
-
Are the required items on the Notice Board? (F10, Insurance, Law Poster, Site Rules, Fire and First Aid).
-
Are the Welfare facilities adequate and clean
-
Are the First Aid Facilities adequate? (First aiders, signage, kit, eye wash, accident book).
-
Are the Fire Procedures adequate? (Plan, points, warden, evacuation, extinguishers, exits)
Site Rules
-
Site Signing in register maintained
-
Site safety induction given to all operatives<br>
-
RA & MS in place for all activities and briefed to all operatives
-
Sub-Contractors. Inducted, RAMS, approved
-
Is Manual Handling being carried out well? (aids, training, technique)
-
Are exclusion zones in place and being followed (vehicles, lifting, noise, fire)
Environmental and Housekeeping
-
Is there safe access and egress to all areas?
-
Is general housekeeping at a good standard around the site?
-
Are immediate work areas kept free from materials as much as possible?
-
Are Hazardous items stored as per MSDS requirements? (flammables)
-
Have Fuels and Oils been stored correctly? (double bunded, canopies, away from drains etc)
-
Are spill kits available and are people trained to use them?
-
Is Waste being stored correctly and segregated either on or off site?
-
Are consignment notes for waste being kept and filed?
Safety Procedures
-
Is electrical safety well managed? (supply, cables, LOTO, 110v)
-
Is the correct PPE being worn (hard hat, High Vis, Boots, Glasses, Gloves)
-
Is task specific PPE/RPE being worn? (cut resistant gloves, Eye protection to 1B, P3 dust masks, Face Fit Testing
-
PUWER - Are plant and hand tools task specific, inspected and being used safely
-
Vibration/HAVS - Are trigger times being monitored / recorded and good working procedures used?
-
CoSHH - Assessments prepared, MSDS's on site and being used/stored correctly.
Specialist Procedures
-
Independent/Tubular Scaffold in good order (7 day inspection, handover, design, pull test)
-
Other work at height equipment, mobile tower scaffold, ladders, hop ups, edge protection (Outriggers, toeboards, PASMA, Leading edge and roof work, Harness, Rescue Plan)
-
Temporary works (Design, inspection, supervision)
-
Is Lifting Equipment compliant with LOLER (Test Certs, LOLER, CPCS, SWL, certificates, planned, organised)
-
Is the Segregation of Vehicles and Pedestrians in place?(Plant movement, traffic plans, banksman)
-
Are Demolition, Excavations and Confined Space work organised and carried out safely? (Design, inspection, shoring, air monitoring, Access & egress, Rescue Plan, Top man, monitoring, training)
-
Is there anything site specific that needs additional measures (conveyors / crushers etc)
-
Are Asbestos Procedures in place and being followed? (R&D Surveys. Clearance certificates, awareness training)
-
Are Services Isolated, protected, signed? (overhead and buried, Gas, Electric, Water, AC, Data, certificated.
Audit on Operatives
-
Of the documents seen during the audit, are all the latest versions being used?
-
Audit against a person
-
Persons Name and Job Title
-
Have they received a site specific Induction
-
Does this person have qualifications to match their Job Title?
-
Has that person been briefed and signed a Method Statement, Risk Assessment, CoSHH Assessment for the tasks that he is completing today?
-
Are they working safely and in accordance with the Method Statement and supporting documents?
-
Have they attended a toolbox talk within the last 7 days?
Additional Items
-
Is there any work coming up that needs additional planning / resource?
-
Is there any additional comments that need to be raised and closed out?
-
Are there any good examples or initiatives to note?
Signatures
-
Audited By:
-
Accompanied by: