Title Page
-
Facility Name
-
Time & Date
-
Facility Supervisor
-
Prepared by
-
Location
Management Activities
-
First aid kit (i.e. not expired, fully stocked, eye wash station available on site)
-
First-aid personnel (i.e. Foreman CPR/AED/FA certified)
-
Safety Program Available (i.e. IIPP electronically and/or hard copy, SDS sheets available)
-
OSHA 300 Log posted Feb. 1st - Apr. 30th (i.e. ONLY in job trailers/offices on site)
-
Medical Clinic map available (i.e. nearest Work Partners and ER)
-
Emergency Response posted/known (i.e. Grab N Go packet)
-
Cal/Fed OSHA postings/permit (i.e. current year poster in job trailer/office or GC has available on jobsite)
-
Toolbox talks/Weekly Safety Meetings (i.e. current week, turned in on time)
-
Jobsite checklist/inspection (i.e. conducted weekly by foreman)
-
Daily Hazard Assessment (i.e. noted, discussed with crew prior to start of task)
-
Sanitary Facilities (i.e. toilets, hand wash stations, properly stocked)
-
Refrigerator Clean & FREE of "Science Experiments"
Access
-
Clear Walkways/Aisles - (i.e. Wet/Slippery Surfaces, Tripping, & Fall Hazards)
-
Perimeter Fencing Locks/Functional
-
Clear Work Space around Machines and Benches
-
Roof Hatch Access Door Locks/Functional
-
Electrical Control Room Locks/Functional
Stairways / Ramps / Ladders
-
Lighting Adequate
-
Clear of material/trip hazards
-
Non Slip Surfaces in good condition
-
Ladders - Stored properly / Good Condition / Operated Properly
-
Non Compliant Ladders (Beyond Repairing) Discarded
General Safety
-
Emergency Shutoff Valve Locations - Known & Identified (i.e. Fire Sprinklers, Water, Electrical, Gas)
-
Work Station Ergonomics / Safe Practices
-
Housekeeping - Full Facility
-
PPE Adequate for Shop Tasks
Fire Equipment & EXITS
-
Fire Extinguishers Accessible - Full Facility
-
Fire Extinguisher - READILY Available when performing HOT WORK
-
Fire Extinguisher - Tagged, Inspected Monthly, and Serviced Adequately
-
Fire EXITS Properly Illuminated
-
Fire EXITS Clear and Unobstructed
Fire Hazards
-
Gas Cans ALL Metal - NO PLASTIC
-
Gas Cans Properly Stored
-
Hot Work / Compressed Gas Cylinders - Contained, Secured, Stored, & Operated Adequately
-
NO OIL Cans or Drums Stored at facility
-
Brush & Other Flammable / Combustibles NOT allowed to accumulate near Building Exterior
-
Flammable / Combustible Storage Areas Labeled
-
NO Smoking Signs Posted
-
Freon Storage Area Locked and Stored adequately
-
Signage Posted on Freon Storage Area
Electrical
-
No Circuit Overloading (i.e. To many cords plugged into a power strip)
-
Permanent Wiring Properly Installed (i.e. Covers on Junction Boxes, Plugs in all unused wholes on panels. Exposed wires)
-
Clear Access to Electrical Panels & must have a minimum 36" of clearance around
-
Electrical Panels "Clearly" Marked
-
GFCI in required locations
-
Grounding & Bonding intact on all plugs
-
NO power strips inside Warehouse / Pre-Fab Shop
Pallets / Racks / General Storage
-
Pallets in good condition (i.e. No Splinters or protruding nails)
-
NO Leaning Pallets against Walls
-
Loads Stacked and/or Properly secured
-
Rack Uprights and Shelving properly sized and secured
-
Racks Legs/Bases secured with minimum 2 bolts (Diagonal cross pattern with 2 bolts)
-
Top Rack Chain/Rope Required if material is not on pallets
-
Minimum 24" of clearance around fire sprinkler heads
-
Clear access to all stored materials
Machinery / Equipment
-
Forklift Condition - Properly maintained and operated
-
Trained Forklift Operator
-
Forklift Inspection Conducted DAILY (Documented)
-
Operator Manual on Forklift
-
Warning Signs / Barricades in place during operations
Maintenance Yard
-
Air Quality
-
Spill Kit
-
Annual Hazmat Training for Shop employees
-
Hand and Power Tools
-
Eye Wash bottles available / Shower in Men's restroom functional
General Comments
-
Other 1
-
Other 2
-
Other 3