Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
ECPM 2 Crane Structure Inspection - Issue Status A
-
Activate STS Structural Maintenance Questionnaire.
-
STS Structural Maintenance
-
Structure Inspection Programs are available for asset types selected?
-
Confirm document number and associated asset including Manufacturer
-
SMP
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select a file of one or more assets, according to fleet size, for inspection of records and check the following is available
-
Structure Inspection Program's are in compliance with crane manufacturer recommendations or have been compiled by qualified consultant. Record the name of the consultant company who has compiled the Structure Inspection Program.<br><br>CM = Crane Manufacturer<br>TPC = Third Party Consultant<br>NM = No Manual.
-
Record name of Consultant
-
Structure Inspection Program's contain the following information:
-
Inspection procedures and processes to be followed
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Requirements for Inspector Qualifications
-
Record Inspectors minimum qualifications.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Reporting Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Frequency of Inspections
-
Frequency of structural inspections and maintenance.
-
Frequency of structural inspections and maintenance.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Typical Repair Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Diagrams and definitions of all joints and welds to be inspected
-
Example of joints and welds to be inspected
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Rejection criteria for the inspection process
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Inspection Record Sheets where inspection data and signatures may be recorded
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Safety Instructions
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select crane assets for checking of the structure inspection records
-
Confirm hard copies of Structure Inspection Records are held on file
-
Structural maintenance report details
-
Support media
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspection Records are in Compliance with ECPM 2
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspector Qualification Certificates are copied to the inspection record
-
Inspector name
-
Inspector certificate
-
Additional NDT inspector
Inspector
-
Inspector name
-
Inspector certificate
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm equipment calibration records are copied to the inspection record
-
Equipment calibration certificates.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm details of repair work and retesting retained on file and cross referenced to the original inspection record
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Comment on Risk condition and explain as necessary
-
Risk condition comment.
-
STS Structural Maintenance Support Media
Support Media
-
Support media
-
Auditors Comments
Comment
-
Comment
-
Activate RTG Structural Maintenance Questionnaire.
-
RTG Structural Maintenance
-
Structure Inspection Programs are available for asset types selected?
-
Confirm document number and associated asset including Manufacturer
-
Support media
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select a file of one or more assets, according to fleet size, for inspection of records and check the following is available
-
Structure Inspection Program's are in compliance with crane manufacturer recommendations or have been compiled by qualified consultant. Record the name of the consultant company who has compiled the Structure Inspection Program.<br><br>CM = Crane Manufacturer<br>TPC = Third Party Consultant<br>NM = No Manual.
-
Record name of Consultant
-
Structure Inspection Program's contain the following information:
-
Inspection procedures and processes to be followed
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Requirements for Inspector Qualifications
-
Record Inspectors minimum qualifications.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Reporting Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Frequency of Inspections
-
Frequency of structural inspections and maintenance.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Typical Repair Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Diagrams and definitions of all joints and welds to be inspected
-
Example of joints and welds to be inspected
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Rejection criteria for the inspection process
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Inspection Record Sheets where inspection data and signatures may be recorded
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Safety Instructions
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select crane assets for checking of the structure inspection records
-
Confirm hard copies of Structure Inspection Records are held on file
-
Structural maintenance program details
-
SMP
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspection Records are in Compliance with ECPM 2
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspector Qualification Certificates are copied to the inspection record
-
Inspector name
-
Inspector certificate
-
Additional NDT inspector
Inspector
-
Inspector name
-
Inspector certificate
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm equipment calibration records are copied to the inspection record
-
Equipment calibration certificates.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm details of repair work and retesting retained on file and cross referenced to the original inspection record
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Comment on Risk condition and explain as necessary
-
Risk condition comment.
-
RTG Structural Maintenance Support Media
Support Media
-
Support media
-
Auditors Comments
Comment
-
Comment
-
Activate RMG Structural Maintenance Questionnaire.
-
RMG Structural Maintenance
-
Structure Inspection Programs are available for asset types selected?
-
Confirm document number and associated asset including Manufacturer
-
Support media
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select a file of one or more assets, according to fleet size, for inspection of records and check the following is available
-
Structure Inspection Program's are in compliance with crane manufacturer recommendations or have been compiled by qualified consultant. Record the name of the consultant company who has compiled the Structure Inspection Program.<br><br>CM = Crane Manufacturer<br>TPC = Third Party Consultant<br>NM = No Manual.
-
Record name of Consultant
-
Structure Inspection Program's contain the following information:
-
Inspection procedures and processes to be followed
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Requirements for Inspector Qualifications
-
Record Inspectors minimum qualifications.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Reporting Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Frequency of Inspections
-
Frequency of structural inspections and maintenance.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Typical Repair Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Diagrams and definitions of all joints and welds to be inspected
-
Example of joints and welds to be inspected
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Rejection criteria for the inspection process
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Inspection Record Sheets where inspection data and signatures may be recorded
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Safety Instructions
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select crane assets for checking of the structure inspection records
-
Confirm hard copies of Structure Inspection Records are held on file
-
Structural maintenance program details
-
SMP
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspection Records are in Compliance with ECPM 2
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspector Qualification Certificates are copied to the inspection record
-
Inspector name
-
Inspector certificate
-
Additional NDT inspector
Inspector
-
Inspector name
-
Inspector certificate
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm equipment calibration records are copied to the inspection record
-
Equipment calibration certificates.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm details of repair work and retesting retained on file and cross referenced to the original inspection record
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Comment on Risk condition and explain as necessary
-
Risk condition comment.
-
RMG Structural Maintenance Support Media
Support Media
-
Support media
-
Auditors Comments
Comment
-
Comment
-
Activate MHC Structural Maintenance Questionnaire.
-
MHC Structural Maintenance
-
Structure Inspection Programs are available for asset types selected?
-
Confirm document number and associated asset including Manufacturer
-
Support media
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select a file of one or more assets, according to fleet size, for inspection of records and check the following is available
-
Structure Inspection Program's are in compliance with crane manufacturer recommendations or have been compiled by qualified consultant. Record the name of the consultant company who has compiled the Structure Inspection Program.<br><br>CM = Crane Manufacturer<br>TPC = Third Party Consultant<br>NM = No Manual.
-
Record name of Consultant
-
Structure Inspection Program's contain the following information:
-
Inspection procedures and processes to be followed
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Requirements for Inspector Qualifications
-
Record Inspectors minimum qualifications.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Reporting Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Frequency of Inspections
-
Frequency of structural inspections and maintenance.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Typical Repair Procedures
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Diagrams and definitions of all joints and welds to be inspected
-
Example of joints and welds to be inspected
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Rejection criteria for the inspection process
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Inspection Record Sheets where inspection data and signatures may be recorded
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Safety Instructions
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Select crane assets for checking of the structure inspection records
-
Confirm hard copies of Structure Inspection Records are held on file
-
Structural maintenance program details
-
SMP
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspection Records are in Compliance with ECPM 2
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Inspector Qualification Certificates are copied to the inspection record
-
Inspector name
-
Inspector certificate
-
Additional NDT inspector
Inspector
-
Inspector name
-
Inspector certificate
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm equipment calibration records are copied to the inspection record
-
Equipment calibration certificates.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm details of repair work and retesting retained on file and cross referenced to the original inspection record
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Comment on Risk condition and explain as necessary
-
Risk condition comment.
-
MHC Structural Maintenance Support Media
Support Media
-
Support media
-
Auditors Comments
Comment
-
Comment
-
ECPM 2 Marking Summary:
-
Add EPCM 2 Score Summary Media?
-
Score Summary
-
Auditor Signature
-
Add Additional Auditor Signature
Additional Signatory
-
Auditor/Authorising Manager Signature