Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

ECPM 5 Crane Hoist Wire Ropes - Issue Status A

  • To audit the BU Purchasing Policy, check and confirm the following compliance requirements from random sample of PO's

  • Wire Rope Procurement, Inspection & Discard Available Points (max 10)

  • Record the Purchase Order Numbers and Dates selected for Audit

  • Purchase Order
  • Purchase Order Number

  • Purchase Order Date

  • PO

  • Hoist Wire Ropes are only purchased from ISO 9001 accredited manufacturers?

  • ISO 9001 Accreditation

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Purchase Orders define Rope Diameter?

  • Rope diameter

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Purchase Orders define Rope Constuction

  • Rope construction

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Purchase Orders define length of rope to be purchased?

  • Rope length

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Purchase Orders define Minimum Breaking Load and/or Tensile Strength

  • Rope MBL and/or tensile strength

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Purchase Orders define Type of End Termination?

  • Type of rope termination

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Purchase Orders define Requirement for Proof Load Test Certificates?

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • To audit the BU Inventory Control Policy, check and confirm the following on random samples of wire ropes in stock:

  • Record the Part Numbers and references for the wire rope samples selected for audit

  • Wire rope part number
  • Part number

  • Confirm that test certificates can be matched to the sample wire rope(s) selected

  • Test Certificate

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm Test Certificate number matches number permanently attached to the wire rope sample?

  • Matching Test Certificate and Wire Rope Numbers

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm Test Certificate defines the rope construction which identical to the rope sample?

  • Wire rope construction

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm Test Certificate defines Date of Test?

  • Wire rope test date

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm Test Certificate defines the Proof Load which was applied?

  • Proof load applied

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm Test Certificate defines the Minimum Breaking Load and/or Tensile Strength?

  • MBL and/or tensile strength

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • To audit the BU Maintenance Policy, select installed hoist wire rope(s) for consideration and check the following:

  • Record the crane assets number and identification of ropes to be considered

  • Asset number
  • Asset number

  • Confirm frequency of wire rope inspections is monthly?

  • Confirm the monthly inspections also apply to boom-hoist wire rope

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm the Inspection Records comply with ICTSI format "Engineering Department Preventive Maintenance - Wire Ropes "

  • Standard ICTSI format for wire rope inspections and discard.

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm wire rope discard criteria complies with BS ISO 4309:2004 and is implemented correctly?

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm inspection of wire rope includes termination points?

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Confirm lubrication application and inspections are adequate?

  • Lubrication of wire ropes on selected asset

  • Corrective Action

  • Corrective Action
  • Priority Level

  • Corrective Action Description

  • Corrective Action Support Media

  • Comment on Risk Condition and explain as necessary

  • Risk condition comment.

  • Wire Rope Procurement, Inspection & Discard Support Media

  • Support Media
  • Support Media

  • Auditors Comments moment

  • Comment
  • Comment

  • ECPM 5 Marking Summary:

  • ECPM 5 Score

  • Add EPCM 5 Score Summary Media?

  • Score Summary

  • Auditor Signature

  • Add Additional Auditor Signature

  • Additional Signatory
  • Auditor/Authorising Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.