Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
ECPM 5 Crane Hoist Wire Ropes - Issue Status A
-
To audit the BU Purchasing Policy, check and confirm the following compliance requirements from random sample of PO's
-
Record the Purchase Order Numbers and Dates selected for Audit
Purchase Order
-
Purchase Order Number
-
Purchase Order Date
-
PO
-
Hoist Wire Ropes are only purchased from ISO 9001 accredited manufacturers?
-
ISO 9001 Accreditation
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Purchase Orders define Rope Diameter?
-
Rope diameter
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Purchase Orders define Rope Constuction
-
Rope construction
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Purchase Orders define length of rope to be purchased?
-
Rope length
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Purchase Orders define Minimum Breaking Load and/or Tensile Strength
-
Rope MBL and/or tensile strength
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Purchase Orders define Type of End Termination?
-
Type of rope termination
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Purchase Orders define Requirement for Proof Load Test Certificates?
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
To audit the BU Inventory Control Policy, check and confirm the following on random samples of wire ropes in stock:
-
Record the Part Numbers and references for the wire rope samples selected for audit
Wire rope part number
-
Part number
-
Confirm that test certificates can be matched to the sample wire rope(s) selected
-
Test Certificate
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Test Certificate number matches number permanently attached to the wire rope sample?
-
Matching Test Certificate and Wire Rope Numbers
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Test Certificate defines the rope construction which identical to the rope sample?
-
Wire rope construction
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Test Certificate defines Date of Test?
-
Wire rope test date
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Test Certificate defines the Proof Load which was applied?
-
Proof load applied
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm Test Certificate defines the Minimum Breaking Load and/or Tensile Strength?
-
MBL and/or tensile strength
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
To audit the BU Maintenance Policy, select installed hoist wire rope(s) for consideration and check the following:
-
Record the crane assets number and identification of ropes to be considered
Asset number
-
Asset number
-
Confirm frequency of wire rope inspections is monthly?
-
Confirm the monthly inspections also apply to boom-hoist wire rope
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm the Inspection Records comply with ICTSI format "Engineering Department Preventive Maintenance - Wire Ropes "
-
Standard ICTSI format for wire rope inspections and discard.
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm wire rope discard criteria complies with BS ISO 4309:2004 and is implemented correctly?
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm inspection of wire rope includes termination points?
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Confirm lubrication application and inspections are adequate?
-
Lubrication of wire ropes on selected asset
-
Corrective Action
Corrective Action
-
Priority Level
- Priority One
- Priority Two
- Priority Three
-
Corrective Action Description
-
Corrective Action Support Media
-
Comment on Risk Condition and explain as necessary
-
Risk condition comment.
-
Wire Rope Procurement, Inspection & Discard Support Media
Support Media
-
Support Media
-
Auditors Comments moment
Comment
-
Comment
-
ECPM 5 Marking Summary:
-
Add EPCM 5 Score Summary Media?
-
Score Summary
-
Auditor Signature
-
Add Additional Auditor Signature
Additional Signatory
-
Auditor/Authorising Manager Signature