Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
LOCATION:
-
Jobsite
-
Client
VERIFICATION:
-
Construction drawings approved for use
-
DRW
-
Rev
-
Material approved for use
-
Material Brand
PIPEWORK
-
1 Pipe work installed as per drawing
-
2. Pipe Bracketed as required
-
3. Pipe labels fitted as required
OUTLETS
-
1. All outlets installed
-
2. Outlets and control valves installed at correct height
Final Checks:
-
1. copper Pipe work not touching metal frames
-
2. All pipe work fastened and secured correctly
-
3. Pressure tested and checked for leaks
-
4. Test pressure KPA
SIGNOFF
-
INSTALLED BY:
-
CHECKED BY:
-
SIGNATURE:
-
DATE: