Information
-
Document reference:
-
Consent Number:
-
Type of Inspection
-
Lot / Site Address
-
Subdivision
-
Conducted on
-
Inspection by
-
Notes
Postline Gib (Where no Fire rating)
Post Line Gib (where no fire rating): to undertake the stopping of installed internal wall linings without Council inspection. Fletchers agree to provide: • RoW from the installer (or supervisor licenced) • PS3 from the Installer verifying compliance to the consent, building code and any applicable specifications and/or standards.
-
Who is the LBP signing off the Bracing elements for this House lot?
-
Which company has installed the linings to the house?
- Specialist Linings Ltd
- Ceiling and Wallboard specialists Ltd (Mike Day)
- Koysta Gib Fixing
- Ultra linings
- Grahame Beere
- Brian Galt
- Other (please specify)
-
Is there a set of consented approved building plans on site for Inspection?
-
Has site been swept out and rubbish removed and placed in skip?
-
Gib Board fixed as per the required Industry standard?
-
Have the wet areas been lined with the required board as per the consented plans ? (Aqualine)
-
Are the bracing patterns and linings on the consent plans completed as instructed in accordance with regulations?
-
Are the Supervisor and Gib fixer satisfied the work has been completed as per the consented plans?
-
Attach a copy of the brace plan signed and dated by the supervisor and/or the LBP
-
Has the RoW from the installer been completed and Issued ?
-
Has a PS3 from the Installer verifying compliance to the consent, building code and any applicable specifications and/or standards been completed and issued to FRL?
-
Please provide photo evidence of: Wet areas. Samples of BL1 and GS1 Bracing.