Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Client's Name
-
Client's Address
-
Premises
-
Certificate Number/Reference
-
Engineers Signature
-
Client's Signature
Details of the system
-
Grade of intruder alarm
-
Monitoring Type
-
Panel Type
System Design
-
Record any changes
Schedule of items checked
System Design
-
Check that the system has been installed and configured in accordance with the system design proposal (any deviations agreed in writing with the customer)
-
Check the system complies with current industry standards
Interconnections and Cabling
-
Check that all interconnections are clearly labelled at the Control & Indicating Equipment, power supply units, expanders, remote key pads and junction boxes
-
Log resistance of detection interconnections or check continuity of bus wired interconnections
-
Record resistance in ohms
-
Check every detector for correct operation through to the Cause & Indicating Equipment
-
Check that all batteries in Cause & Indicating Equipment and/or Power Supplies are marked with the date of installation
Device Operation
-
All SAB operate on battery voltage
-
Record the voltage at the SAB
-
The SAB operates when hold off voltage is removed
-
Operation of all tamper devices
-
Check the area or volume of coverage of movement/vibration detectors including alignment of active beam detectors and any anti-masking or range reduction facilities (as appropriate)
-
Check the operation of the entry/exit route
-
What is the entry time
-
What is exit time
-
When the system is set, check it alarms correctly when activated
Power Supplies
-
Mains supply is from an unswitched fused connection unit
-
The supply fuse rating is 3a
-
The mains supply can not be accidentally or intentionally switched off
-
Cause & Indicating Equipment have had their current draw taken
-
Current draw of Cause & Indicating Equipment in alarm
-
Current draw of Cause & Indicating Equipment in quiescent
-
Power Supplies are fitted
-
Current draw of Power Supply Equipment in alarm
-
Current draw of Power Supply Equipment in quiescent
-
The system operates correctly on battery supply only
-
All voltages are within the acceptable limits when the system is on battery standby
-
Standby duration of the battery is suitable for the grading of the system
Alarm Transmission System
-
System is monitored
-
All signal paths have been tested and reported correctly to the Alarm Receiving Centre
-
Signal paths operate correctly when the system is alarmed
Hand Over
-
Client has been shown how to use the system correctly
-
The limits of detection have been shown to Client
-
All documentation has been completed correctly
-
Number of fobs issued to client