Information
-
Audit reference number
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel audited.
-
System type
COMPETENCE
-
External warning devices (audible and visual)
-
Control and signalling equipment
-
Check mains compliance certificate
-
Customer operating instructions
-
Mains. Fused spur and fuse, cable and entry
-
Installer to open panel. Check logbook, if applicable
-
Cable connections within panel
-
Grommets on cable entry holes (metal box)
-
Incoming cable identified and neatly run
-
Battery. Dated, sized, are connections tested
-
Test self-actuating warning device
-
Check reset type customer, engineer or CS reset
-
Close panel. Check cable runs to panel
-
Protective switches on doors, windows
-
Siting and fixing of movement detectors
-
Walk test movement detectors
-
Check anti-tamper on detectors
-
Siting and fixing of vibration sensors
-
Window foil, CC wire, tube and batten
-
Citing and fixing of wiring: junction boxes
-
Siting and operation of deliberate operated devices
-
Set system. Test operation of warning devices.
-
Remote signalling. Make test call
-
Overall standard of installation, workmanship
-
Installation checked against quoted specification
HEALTH AND SAFETY COMPLIANCE
Management of Health and Safety
-
Has the person read and understood the Moore Secure health and safety policy
-
Are staff in possession of the health and safety handbook?
-
Are staff were of the accident book and its whereabouts?
-
Is a current and valid CSCS card available?
-
Are staff aware of the specific site safety rules?
-
Has a suitable and appropriate risk assessment and method statement being compiled?
Hazards and Operational Requirements
-
Has the site been checked for asbestos?
-
Is work being conducted in a confined space?
-
Is there any potential hazardous materials being used?
-
Is excessive noise or vibration a factor on this particular site?
-
Has all electrical and mechanical equipment been suitably tested or inspected?
-
Are staff wearing suitable and fit for purpose PPE.
CORRECTIVE AND PREVENTIVE ACTIONS
-
When nonconformance has been identified in either the compliance section all health and safety section of this audit report, it is vitally important that all corrective and preventive actions are clearly identified.
-
Corrective Action
NCR, Corrective Action, Responsibility, Deadline
-
Preventive Action
NCR, Preventive Action, Responsibility, Deadline
-
Signature of employee
-
Date of Acceptance
CLOSURE AND APPROVAL
-
Signature of auditor
-
Date of Acceptance