Title Page

Post-tensioning ITP for Stressing

  • Client

  • Post-tensioning ITP Stressing prepared by

  • Project Name

  • Project Number

  • Level and pour number

  • Stressing Date

  • Location
  • This Post-tensioning Inspection & Test Plan (ITP) must be completed for each slab stressed on the project.

Equipment Check

  • Is the calibration certificate for the Jack and Gauge current? (within 6 months)

  • Type in required Initial Stressing pressure (check calibration certificate)

  • Type in required Final Stressing pressure (check calibration certificate)

Required concrete strength achieved

  • Type in the lowest concrete test result achieved for the Initial Stressing

  • Type in the lowest concrete test result achieved for the Final Stressing

  • Were the concrete cylinders cured on site?

  • Were hard copies of the concrete strength results received?

Wedges

  • Note batch number and suppliers name

  • Note batch number and suppliers name

  • Note batch number and suppliers name

  • Note batch number and suppliers name

Blocks and Barrels

  • Note batch number and suppliers name

  • Note batch number and suppliers name

  • Note batch number and suppliers name

  • Note batch number and suppliers name

All Tendons Stressed

  • Have all Tendons been stressed?

Stressing Extensions

  • Have the extensions been measured and recorded?

  • Have the extensions been submitted for approval?

  • SRG Leading Hand - I confirm the post-tensioning stressing is complete.

  • Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.