Title Page
Post-tensioning ITP for Stressing
-
Client
-
Post-tensioning ITP Stressing prepared by
-
Project Name
-
Project Number
-
Level and pour number
-
Stressing Date
-
Location
-
This Post-tensioning Inspection & Test Plan (ITP) must be completed for each slab stressed on the project.
Equipment Check
-
Is the calibration certificate for the Jack and Gauge current? (within 6 months)
- If yes, Type in date of calibration + Jack & gauge Number
- If No, DO NOT use
-
Type in required Initial Stressing pressure (check calibration certificate)
-
Type in required Final Stressing pressure (check calibration certificate)
Required concrete strength achieved
-
Type in the lowest concrete test result achieved for the Initial Stressing
-
Type in the lowest concrete test result achieved for the Final Stressing
-
Were the concrete cylinders cured on site?
- Yes
- If No, were they air or water cured?
-
Were hard copies of the concrete strength results received?
Wedges
-
Note batch number and suppliers name
-
Note batch number and suppliers name
-
Note batch number and suppliers name
-
Note batch number and suppliers name
Blocks and Barrels
-
Note batch number and suppliers name
-
Note batch number and suppliers name
-
Note batch number and suppliers name
-
Note batch number and suppliers name
All Tendons Stressed
-
Have all Tendons been stressed?
Stressing Extensions
-
Have the extensions been measured and recorded?
-
Have the extensions been submitted for approval?
-
SRG Leading Hand - I confirm the post-tensioning stressing is complete.
-
Main Contractor