Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Final Inspection Checklist for Crowd Case Transmission

  • Exposed machine surfaces and gears: Has rust inhibitor been applied to these surfaces?

  • Case: Has it been NDT inspected after repairs to confirm there are no cracks (particular around gussets and mounting face)?

  • Mounting Hardware: Is it boxed with job number and secured to shipping stand?

  • Shipping skid/stand: Is it mounted securely?

  • I.D. Plates: Are they marked according to job acknowledgement?

  • Parts list: Has it been added to pouch from warehouse / receiving area?

  • Final photos: Have final photos been taken?

  • Ensure Joy Global lifting brackets re removed prior to shipment.

  • Holes in case: Have the holes been plugged?

  • Paint: Ia paint job up to acceptable standards (This includes crowd case shipping cover).

  • Has job number and country code been stamped in plate and body? (US, AU, CA)

  • Stencil the part number, weight, job number, and Joy Global on gearbox/transmission.

Job information

  • Inspectors name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.