Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Final Inspection Checklist for Letourneau B40 Wheel Motor
-
Has joy Global tag been installed and is it accurate?
-
Has job number and country code been stamped into the frame?
-
Shell Pinion: Is it seated against the labyrinth seal?
-
Brake Hub: Is it seated against the labyrinth seal?
-
Is motor clean internally?
-
Is work-scope checklist signed off?
-
Is parts list in the job pouch from warehouse / receiving area?
-
Are leads secure for shipment?
-
Has rotor been locked? (Note: Only if brake disc is not attached)
-
Have final photos been taken?
-
Are all bolted connections tight?
-
Is prep & paint up to Mesa Joy Global quality standards?
-
Ensure there are four (4) desiccant crystal packets added to the outside of a motor prior to wrapping the motor in plastic. (ALL MOTORS)
-
Inspector's name: