Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Final Inspection Checklist
-
Bushings: are they pinned and seated?
-
Top Hyd. Lift Kit Mount: if applicable, are the threads and mounting blocks ok?
-
Shims: are there five on the top wear plate and six on the side?
-
If CEP: is unit mounted to metal shipping skid?
-
I.D. Plates: are they marked according to job acknowledgement?
-
Is paint up to Joy Global acceptable standards?
-
Wear Plates: are they new?
-
Lifting Eyes: Are they in good condition?
-
Top Wear Plates: Are bolts in holes? If no, are threads in good condition?
-
Is work-scope signed off and parts list added from warehouse / receiving area to the pouch?
-
Have both sides of saddle block been visually checked?
-
Have final photos been taken?
-
Lubricant Line Hardware: are loops ok? Is uni-strut in good condition?
-
Job Number: Is it stamped in frame?
-
Has transition been MT checked?
-
Are broken bolts removed and holes tapped?
Job information
-
Inspectors name