Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Final Inspection Checklist

  • Bushings: are they pinned and seated?

  • Top Hyd. Lift Kit Mount: if applicable, are the threads and mounting blocks ok?

  • Shims: are there five on the top wear plate and six on the side?

  • If CEP: is unit mounted to metal shipping skid?

  • I.D. Plates: are they marked according to job acknowledgement?

  • Is paint up to Joy Global acceptable standards?

  • Wear Plates: are they new?

  • Lifting Eyes: Are they in good condition?

  • Top Wear Plates: Are bolts in holes? If no, are threads in good condition?

  • Is work-scope signed off and parts list added from warehouse / receiving area to the pouch?

  • Have both sides of saddle block been visually checked?

  • Have final photos been taken?

  • Lubricant Line Hardware: are loops ok? Is uni-strut in good condition?

  • Job Number: Is it stamped in frame?

  • Has transition been MT checked?

  • Are broken bolts removed and holes tapped?

Job information

  • Inspectors name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.