Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Add media

  • Personnel

Visual Outside

  • Fences and boundaries are in place and secure

  • Nature strip is clear of obstructions and building materials

  • Building permit and contact details are visible from outside the site

  • Warning signs are in place to indicate construction zone

  • Access is clear for emergency vehicles , services

  • No Smoking is observed on site

  • Walkways are clear

Electrical

  • Temporary power is available on site

  • Temporary power is marked correctly (main isolator) and RCD's tested tagged

  • Leads are protected from cabinet door closing on them (Pinching)

  • 1mt square clearance in front of temporary power board

  • RCD boxes are test tagged and current (Monthly)

  • Double adaptors on site

  • Is there electrical equipment on site

  • How many items have current test dates

  • Are tiger tails in place on incoming power lines

  • Has mains power been isolated

General

  • Has gas service been isolated

  • Are toilet facilities provied

  • Is fresh water available

  • Is there a bin on site

  • Does it have asset protection underneath

  • Does the bin have room for additional waste

  • Housekeeping is in a good condition <br>No rubbish

Trades compliance

  • Have all trades completed an induction<br>White card , JLG online

  • Do the trades on site have adequate signed SWMS for the work being carried out

  • Do trades have correct high risk licences

  • PPE - Is suitable ppe being worn and used

Working at hieght

  • Is there working at height actives being under taken at the site

  • Are ladders secured at the top and bottom

  • Ladders exceed 900mm past landing platforms

  • Fibreglass ladders are being used near electrical supply and when undertaking electrical works

  • No hot works being undertaken or performed from a ladder

  • Fall protection is adequate on edges , platforms and penetrations

  • Are two access points in place

  • Ladder work has been identified in SWMS <br>ladders used as a last resort <br>Ladders are not being straddled <br>No standing higher than the second rung from top of ladder

  • Is there scaffold over 4mts on site

  • Is there a scaffold tag (scaftag)

  • Are planks in place <br>No gaps over 10mm

  • Are all toe boards in place on working sections

  • Has the scaffold been tied to the building and is no secure (No movement)

  • Is unauthorised access controlled

Asbestos

  • has asbestos been identified on the site

  • Johns Lyng Asbestos guideline in place

  • Signage in place

  • Correct operator in attendance on site

  • Do the trades have asbestos control methods included in their SWMS

  • Clearance certificate has been obtained

Plant and Equipment

  • Daily prestart checks completed

  • Recommended PPE worn for operating the plant

  • Warning lights in working condition

  • Reversing beepers in working condition

  • Safety information and service records available

Hazardous substances

  • SDS available and current (Within 5 years of issue)

  • All chemical and substance containers correctly labelled

Traffic Management

  • Tasks being performed are correct and include signage , PPE

  • Traffic management plans in place

  • Traffic management personal have correct quailifications

Environment

  • Environmental issues have been identified and controls in place

  • Wet weather controls in place

Comments

Signoff

  • Add signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.