Title Page
-
Site conducted
-
Conducted on
-
Bobby Garrett
-
Gainesville. Ga
Load Side
-
Is the incoming material being inspected for defects?
-
Are the hook instructions for the die being hung pulled up?
-
Are the hook instructions being followed?
-
Are hooks being burnt as prescribed?
-
Is the "Burnt Hook Log" updated?
Washer
-
Are titrations being completed every 2 hours?
-
Stage 1 - Is temp between 130F-140F?
-
Is the PSI between 15-20?
-
Stage 1 - Is the bv% between 1.34% - 1.68%
-
Stage 1 - Is the C titration >1?
-
Stage 1 - Is the dry off oven temperature between 240F -260F?
-
Stage 2 - Is the PSI between 15-20?
-
Stage 2 - Is the conductivity less than 5000 us?
-
Stage 2 - Is the PH between 10-11?
-
Stage 3 - Is the PSI between 15-20?
-
Stage 3 - Is the conductivity less than 1500 us?
-
Stage 3 - Is the PH between 8-10?
-
Stage 4 - Is the PSI between 15-20?
-
Stage 4 - Is the conductivity less than 500 us?
-
Stage 4 - Is the PH between 6-8?
-
Stage 5 - Is the temp between 100F-110F?
-
Stage 5 - Is the PSI between 15-20?
-
Stage 5 - Is the Cr level between 8.0 - 10.0 ML's?
-
Stage 5 - Is the fluoride levels in range for the line speed being ran? (12fpm = 400-600) (18fpm = 600-800)
-
Stage 6 - Is the PSI between 15-20?
-
Stage 6 - Is the conductivity less than 1500 us?
-
Stage 6 - Is the PH between 4-6?
-
Stage 7 - Is the PSI between 14-20?
-
Stage 7 - Is the conductivity less than 500 us?
-
Stage 7 - Is the PH between 5-7?
Paint Kitchen
-
Have paint batches being used been inspected prior to being used?
-
Are all paint batches being checked for incoming temp?
-
Are all paint batches being checked for incoming viscosity?
-
Are all batches being checked for temp after mixing?
-
Are all batches being checked for viscosity after mixing?
-
Are all tools in good condition?
-
Is tool calibration up to date?
-
Is the back pressure on the pumps within range?
-
Is the pig launcher PSI within range?
-
Are all drums in the paint kitchen grounded to the copper bus bar?
-
-
Are all PM's current?
-
Which PM's are past due date?
Bake Oven
-
-
Is the oven being checked every 5 minutes?
-
What is the longest span of time the oven has not been checked?
-
Has the datapaq been ran?
Unload Side / QC
-
Are all QC tools in good condition?
-
Are all tools calibrated?
-
Which tool need calibration?
-
Is the QC Tech performing the tests per ASTM?
-
Are the parts being packaged per the AS400 and die draw?
-
Do the AS400 and die draw instruction match?