Information

  • Name:

  • Date:

  • Location:

  • Stope:

  • Level:

  • Supervisor:

Pre Blast Inspection

  • Is all gear removed from heading (above and below blast)?

  • Are the mucking wedges moved and set up?

  • Are serviced pulled back (above and below blast)?

  • Are all holes drilled accordinly to print?

  • Are all BT holes flagged and checked?

  • Has the inverse been probed, cleaned and mapped?

  • Have the results been communicated to supervisor and engineer?

  • Has powder been ordered?

  • Is all necessary gear/equipment available?

  • What gear/equipment is needed?

  • Checked electrical service to fan?

  • Are silnuts/barricades required for open holes?

  • Is Central Blast line presinent to standard?

  • Cell Supervisor:

  • Boart Supervisor:

  • Planner:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.