Pre Blast Inspection
Is all gear removed from heading (above and below blast)?
Are the mucking wedges moved and set up?
Are serviced pulled back (above and below blast)?
Are all holes drilled accordinly to print?
Are all BT holes flagged and checked?
Has the inverse been probed, cleaned and mapped?
Have the results been communicated to supervisor and engineer?
Has powder been ordered?
Is all necessary gear/equipment available?
What gear/equipment is needed?
Checked electrical service to fan?
Are silnuts/barricades required for open holes?
Is Central Blast line presinent to standard?