Information

  • Month/Document No.

  • Main Contractor

  • Site

  • Location
  • Conducted on

  • Prepared by

  • Drawing Used For Area Being Assessed

  • Persons Carrying out work to Area being Accessed

Rules of WIR and Progress Reporting 1. All reports need to be in for the dates that have been agreed on the reporting timetable. If there are any reports missing the reporting manager (AS) needs to make contact with the contracts manager (JHL), finding out why reports are missing and getting confirmation when they will be in. Everybody needs to remember that there is a maximum of three working days over date of when the report needs to be in. It is not an option for reports not be done after three days. 2. Generally, there should be reports prepared for each elevation, where all assessed levels are listed. Each single report may include more than one elevation. However, it must be clearly described in the introduction which facades have been examined and what works have been completed during the assessment. 3. When job is being handed over to the project manager/contracts manager, the Reporting manager must prepare a construction plan drawing of the project, number each elevation and then refer to these numbers when conducting Work Inspections. 4. Construction plan layout drawings with numbered elevations must be saved onto the M Clarkes reporting folder on the Network. Jobs/Projects/Quality. 5. Each report should include in the introduction (cover page of report) description of the assessed façade (assigned number) along with the description of type of works which were completed as assessed façade (assigned number) along with description of type of works which were completed and assessed by project manager. 6. We have issued standard detail drawings reference numbers D01, D02, D03, D04, D05 and so on. These are available in "M Clarkes Guidance Booklet” and need to be referred to throughout WIR and clearly show what is required. 7. The report with error/failure marked RED, must be saved on the system. The next report that will follow must show how the error was rectified. If improvement was not possible, eg: due to soft ground/lack of access, it needs to be described/explained. The answers column still needs to be highlighted red. However, if the error was rectified the section should be changed to green. The comment section is to be used for explanations of how and when error was rectified. 8. If project manager has found an error during the assessment, it must be noted and fixed before consecutive stages of works progresses, eg: CP board cannot start before Metsec sub frame is properly fixed. Quality Control Manager cannot accept the next WIR report until everything is fixed and up to date on the previous report. This is to make sure that all errors are corrected, and there are no error omissions. 9. Progress reports need to be genuine and relevant. 10. It is important that progress reports always have delay events. 11. All reports have to be sent to main contractor and subcontractor.

  • Have all items been closed out on Pre-start Minutes. If not please attaché comment/action for relevant project team and circulate.<br>

1. PROGRAMME & PROGRESS.

  • Add media

2. RESOURCES

  • Add media

3. Procurement- information with regard to materials and plant.

  • Add media

4. ELEVATION SIGN OFF

  • Add media

5. DESIGN

  • Add media

6. COST INSTRUCTIONS

  • Add media

7. HEALTH & SAFETY

  • Add media

8. DELAY EVENTS

  • Add media

9. ADDITIONAL NOTES

  • Add media

10. CONTRACT NOTICES

  • Add media

11. COST/EXTRA WORKS

  • Add media

PHOTOS ENCLOSED/PROGRAMME

  • Add media

  • Signature of the Project Manager:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.