Title Page
-
Site conducted
-
Project type
-
Project name
-
CAB Number
-
Start date
-
Method of installation
-
Who is completing works
-
Have pre build photos been uploaded to Dashpivot? (Esure existing damage is captured and documented)
-
Is PIA to be used as method of entry?
-
Please ensure a "whereabouts" is raised and PIANO labels fixed to duct(s).
-
Photo of PIANO labels in place.
-
Is a Civils dig required?
-
What is the permit number?
-
Will fire stopping be required?
-
Please ensure all breaches are fire stopped before leaving site. Each breach to be labelled.
-
Post build photos uploaded to Dashpivot?
-
Light source input through splitter(s) and verified light at each prem?
-
Full fault diagnosis and rectification works to be completed before build can be released.
-
Power loss level at splitter(s)
-
Date works complete
-
Is project ready to be released for sales?
-
Please email an update to Dan Davis, Rob Reaks and Daryl Knight.
-
Signed off by: