Title Page
-
Site Name
-
Site Address
-
Conducted on
-
Prepared by
-
THP Count
-
Onsite Contact
-
Access Requirements
-
Picture Of Building
Method Of Feed
-
External chamber
-
Is there an existing duct into Property
-
Existing Internal Duct Location
-
Is MDU Roped
-
Are Civils Activities Required
-
Cityfibre Toby
-
Openreach Pole
DP Locations
-
DP Location and route to it
Floorplans
-
Lower Ground floor
-
Ground Floor
-
First Floor
-
Second Floor
-
Third Floor
-
Fourth Floor
-
Fifth Floor
-
Sixth Floor