Title Page
-
Project name:
-
Site Safety Walk Location
-
Conducted on
-
Prepared by:
-
Site Contact:
Activity being undertaken:
-
- Excavation activities
- Concrete Placement
- Structural works
- Pipework Installation
- Electrical/Instrumentation installations
- Confined Space Entry
- Working at Height
- Floating cover installation
- Pipe relining works
- Earthworks
- Pipeline installation
- Working on over or near water
- Traffic management
- Pump installation/removal
- Hydro excavation
- Roofing works
- Dredging works
- Valve/Penstock works
- Building refurbishment works
- Road works
- Welding activities
- Crane activities
- Road construction
- Electrical/Instrumentation commissioning
- Mechanical commissioning
- Mechanical works
- Electrical/Instrumentation works
- Environmental works
-
Other activity not noted on the pick list:
Observations:
-
Add media
-
Supportive Drawing if required:
-
Sign off by the person completing the Inspection:
-
Sign off by the Site Project Manager