Information
-
Merrion Centre - Vacant Unit Mobilisation Checklist
-
Unit Address
-
Conducted on
-
Prepared by
Site Documentation
-
O&M manual on file?
-
Current site plans on file?
-
Is the unit statutory compliant and records on file? (Record details of items of non compliance)
-
Asbestos Survey and Management Plan on file?<br>
-
EPC on file?
-
Weekly call point test log created?
-
Flushing regime log created?
-
Meter readings recorded and placed on file?
-
Utility accounts transferred to Town Centre Securities?
-
Vacant unit risk assessment completed and held on file?
-
Keys/Fobs tagged and placed in the control room key cabinet?
-
Alarm/Door codes been recorded?
External Review
-
Is the exterior to the property issue free?
-
Is the loading bay clear of all items?
-
Are all fire doors in good condition and secure?
Internal Review
-
Is the interior of the property (including signage, plants rooms, decoration) issue free?
-
Is the cleaning to an acceptable standard?
-
Has all PFE been tested within the last 12 months?
-
Is the roof access restricted and appropriate signage displayed?
-
Are fire exits clear and accessible?
-
Are windows covered/marketing graphics added?
-
Are utilities isolated where possible (i.e. Water, Gas, Electric)?
Lift Information
-
Record Of lift details, including make, reference number, weight capacity etc.
-
Does the lift alarm sound?
-
Does the Lift alarm connect to a monitoring centre? (Give details of monitoring company and lift line number)
-
Are "Do not use lift in case of fire" signage present?